Full Home Remodeling
Home remodeling contractor in Austin, done in one pass
Gut renovations, kitchens, baths, and layout changes, run by one crew so the house is finished on schedule and not in phases that never end.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
What's included
Whole-home renovation
Demolition to final paint, including layout changes, wall removals, and structural beams.
Kitchens and baths
Cabinetry, tile, countertops, fixtures, and lighting, coordinated as one scope.
Exterior and envelope
Roofing, siding, windows, and doors so the outside matches the inside.
Flip and rental renovations
Investor-focused scopes priced for resale value and fast turnaround.
Remodeling in Austin
What a full home remodel with us looks like
One crew, one schedule. Our in-house crews handle demolition, framing, drywall, concrete, trim, tile, and most finishes, so the job moves from one phase to the next without waiting on a new sub each week. Licensed electrical, plumbing, and HVAC partners work on the same schedule.
Itemized pricing. Every proposal lists the scope line by line with a single lump-sum total. Allowances are spelled out, so you can compare bids apples to apples.
Older-home realities. Many Austin-area homes have original wiring, cast-iron drains, undersized framing, or foundation movement. We plan for what a gut remodel usually exposes and tell you up front how we handle it.
Permits and inspections. If the work moves walls, adds square footage, or changes electrical, plumbing, or mechanical systems, it usually needs a permit. We prepare it and meet the inspectors.
Common remodel scopes
Kitchen remodels with layout changes, primary bath and shower rebuilds, opening up walls with structural beams, whole-home gut renovations, additions, and exterior updates like roofing, siding, and windows, including tracing leaks to failed flashing and rebuilding the rotted framing behind it (see signs of bad flashing and what flashing is). Planning a kitchen or bath? Read our kitchen remodel timeline, bathroom remodel timeline, or home addition timeline and see our custom cabinets and vanities. For a full gut with structural work, see the El Viejo Camino barn remodel. Recent bath work includes a custom steam shower and bathroom remodel and a marble-look primary bath, and for exterior repairs see the West Milton siding repairs.
How we bid & build
Onsite walk, itemized fixed bid, then we build
- 01
Onsite walk
We walk the house with you, room by room. We look at what is behind the walls where we can, the structure, the panel, the plumbing, and how you live in the space.
- 02
Itemized fixed bid
You get an itemized fixed bid with every scope line listed, allowances spelled out, and one lump-sum total, plus a schedule for your remodel and a plan for living in or out of the house.
- 03
Build
Our crews handle demolition, framing, drywall, trim, tile, and most finishes, with licensed electrical, plumbing, and HVAC partners on the same schedule. One point of contact throughout.
We don’t publish price ranges or per-square-foot numbers. Every bid is built from your site and your scope, after we have seen it in person. Request an estimate →
Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Full Home Remodeling across Central Texas
Questions
Common questions
How long does a full remodel take?
Most whole-home remodels in the Austin area run 8 to 16 weeks depending on size, structural changes, and permit timing.
Can we live in the house during the remodel?
For phased kitchen or bath work, often yes. For whole-home gut renovations, we usually recommend moving out.
How do you price remodels?
We give an itemized proposal with every scope line and a single lump-sum total, so you can compare it apples to apples.
Do I need a permit for a home remodel?
Usually, if the work moves walls, adds square footage, or changes electrical, plumbing, or mechanical systems. Cosmetic work like paint or flooring typically does not. We confirm what your scope needs and handle the permit.