Austin, Texas
General contractor in Austin
Luxury custom homes, whole-home remodels, custom cabinetry, and commercial construction across Austin, from central and east Austin infill to hillside lots out west. Every project starts with an onsite walk and an itemized fixed bid.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Building in Austin
What to know before you build or remodel in Austin
Permits run through the City of Austin. Most remodels that move walls, add square footage, or touch electrical, plumbing, or mechanical systems need a building permit from Austin Development Services, plus inspections at each stage. We prepare the permit package, submit it, and meet the inspectors on site.
The HOME code opened up infill. Under the city's HOME amendments, most lots zoned SF-1, SF-2, or SF-3 can hold up to three homes, and HOME Phase 2 allows one home on a lot as small as 1,800 square feet (Austin Development Services). Two- and three-unit projects still have to fit floor-area, building-coverage, and impervious-cover limits, and some older neighborhoods with conservation districts follow different rules. We price those limits into the design from day one.
Older Austin houses hide surprises. Original wiring, cast-iron drains, undersized framing, and settled foundations are common in central, east, and south Austin homes. A full gut remodel exposes them, so our proposals call out how we handle what we find instead of leaving it to change orders.
Commercial space has its own path. Tenant finish-outs and ground-up commercial work add site plans, accessibility requirements, and fire-lane and utility coordination before a certificate of occupancy.
Austin neighborhoods we serve
We're based in Northwest Austin (78729) and work across the city, including:
- Northwest Austin: Anderson Mill, Avery Ranch, Great Hills, and the Arboretum (78729, 78750, 78717, 78759)
- Lake Austin and the west side: Steiner Ranch, River Place, Barton Creek, Rollingwood, and West Lake Hills (78732, 78730, 78735, 78746)
- Central Austin: Tarrytown, Old West Austin, Hyde Park, Allandale, and Crestview (78703, 78751, 78756, 78757)
- South Austin: Travis Heights, Bouldin Creek, Zilker, South Shore, and Circle C (78704, 78741, 78739, 78749)
- East Austin: East Austin, Mueller, and Windsor Park (78702, 78723)
- Downtown: commercial finish-outs, offices, retail, and restaurants (78701)
Each part of town brings its own issues. Older central and east Austin homes often need a full gut and a permit history check. West side lots bring hillside foundations, trees, and impervious cover limits, and downtown spaces bring commercial plan review and building management rules.
Local work
Our work in and around Austin

Wahoo's Fish Tacos, South Shore
Ground-up restaurant and bar, from a cleared lot to opening day.
View project →
A house and an ADU on Vargas Street, set up as two condos
Infill development: a new house and ADU on one lot, built and then set up as a two-unit condo regime.
View project →
Supermarket site earthwork
Demolition, mass excavation, fill and compaction, and a finished building pad.
View project →
Oltorf apartments retaining walls and parking lot
Full demo and replace: failed retaining walls rebuilt and the complete parking lot replaced.
View project →
Custom cabinets, vanities, and closets
White oak, walnut, black, and shaker kitchens, islands, bath vanities, and linen towers.
View project →Services in Austin
Custom Homes in Austin
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →Design-Build in Austin
One contract from first sketch to final walkthrough.
Learn more →Full Home Remodeling in Austin
Whole-home, kitchen, bath, and addition remodels.
Learn more →Commercial Tenant Finish-Out in Austin
Office, retail, restaurant, and medical suites built to lease.
Learn more →Custom Cabinetry in Austin
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →Civil & Site Work in Austin
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Nearby
Also serving
Questions
Common questions
Do I need a permit to remodel in Austin?
Usually, if the work moves walls, adds square footage, or changes electrical, plumbing, or mechanical systems. Cosmetic work like paint or flooring typically does not. We confirm what your scope needs and handle the permit.
Can I build more than one home on my Austin lot?
Often, yes. The HOME amendments allow up to three units on most SF-1, SF-2, and SF-3 lots, subject to floor-area, coverage, and impervious-cover limits. Deed restrictions and some neighborhood districts can still limit it. We check your lot before design.
What parts of Austin do you work in?
All of Austin, including central, east, and south Austin, plus surrounding cities like Round Rock, Cedar Park, Pflugerville, Buda, and Kyle.
How do I get an estimate?
Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.