StealthGeneral Contracting
Call

Custom Cabinetry

Custom cabinets in Austin, built to the room

Kitchens, islands, pantry and oven walls, bath vanities, linen towers, and walk-in closets. Our crew builds, sets, and finishes the cabinets, then coordinates the tops, tile, plumbing, and electrical so the room comes together under one contract.

Walnut slab-front kitchen cabinetry with a full-height marble backsplash and professional range

5.0 on Google3 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

What's included

Kitchens and islands

Base and wall runs, tall pantry and appliance walls, and islands with drawer banks, sized to the room's exact dimensions.

Bath vanities and linen towers

Double vanities, makeup desks, and linen towers, including one recessed flush into a stone-slab wall.

Closets and built-ins

Walk-in closet systems with glass doors, drawer stacks, hanging sections, and shoe shelving.

Styles

Walnut and flat-panel modern with grain matched across the run, two-tone, black, and classic white shaker.

From boxes to finished room

How we build cabinetry

1. Measure and lay out. After the onsite walk we lay out every run to the room’s real dimensions, including corner and sink bases, appliance openings, and fillers, so the cabinets fit the walls you have.

2. Build and set the boxes. Base and wall boxes go in level first, then tall pantry and oven walls and islands with drawer banks.

3. Fronts and finish. On flat-panel kitchens we cut the slab fronts so the grain runs continuously across each run. Shaker, painted, black, and two-tone finishes are done to match the rest of the house. Want to keep your existing boxes and just change the color? Our sister company does cabinet painting and refinishing.

4. Tops, tile, and trades. We coordinate quartz, granite, or marble tops, tile backsplash, undermount sinks, plumbing, and lighting, so the room is finished, not just the boxes.

Our cabinetry

Kitchens, baths, and closets we’ve built

See every room →

Google reviews

What clients say

5.0 on Google3 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel

“Great work. Absolutely knows what he’s doing.”

Michael Candelaria
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Custom Cabinetry across Central Texas

Questions

Common questions

Do you build and install custom cabinets in Austin?

Yes. We build and install cabinetry sized to the room: base and wall cabinets, tall pantry and oven walls, islands, bathroom vanities, linen towers, and closet systems.

Can you do cabinets as part of a larger remodel?

Yes. Most of our cabinetry goes into whole-home remodels, kitchen remodels, and new homes, where we also handle demolition, framing, plumbing and electrical coordination, tile, and countertops.

How do you price custom cabinets?

We walk the room, measure, and talk through layout, style, and finishes. Then you get an itemized fixed bid that lists each run, the fronts and finish, hardware, and install, with one lump-sum total. We don't publish price ranges because every room is different.

Do you handle countertops and backsplash?

Yes. We coordinate quartz, granite, or marble tops, tile backsplash, plumbing, and electrical so the kitchen or bath is finished under one contract.

What should I have ready for the onsite walk?

Photos or saved images of styles you like, a rough idea of appliances, and any plans if the room is changing. We take the measurements.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate