StealthGeneral Contracting
Call
Finished kitchen with black shaker cabinetry, natural-wood uppers, and a waterfall island by Stealth General Contracting

Stealth General Contracting · Austin, Texas

Austin luxury custom homes, remodels & commercial construction

Built straight. Priced straight.

High-end custom homes, whole-home remodels, custom cabinetry, and commercial build-outs. Every project is walked and bid onsite, with one team accountable from drawings to final walkthrough.

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

What we build

Custom homes, remodels, and commercial work

Recent work

Finished work

See all projects →

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

Civil and concrete

Site, concrete, and structural work

All civil projects →

How we build

Watch a hillside home go up, stage by stage

From the three-phase foundation to framing, mechanical, electrical, and plumbing, finishes, and landscaping. Tap Narration to hear each step, or watch the narrated video on YouTube and see the 14 stages explained.

Finished three-level hillside home from the construction animation
Finished Vargas Street homes in Austin, built by Stealth General Contracting

About

Team-led, built with a quality-control mindset

Stealth General Contracting is an Austin, Texas general contractor owned and run by Chris Jenkins. We build luxury custom homes, whole-home remodels, custom cabinetry, and commercial projects.

We are also a concrete and civil contractor, so our own crews handle the foundations, retaining walls, and site work that most builders hand off. Every project is walked and bid onsite, every bid is itemized with one lump-sum total, and you deal with one team from the first walk to the final walkthrough.

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

General contractor across Central Texas

Questions

Common questions

What areas do you serve?

Austin and surrounding towns including Round Rock, Cedar Park, Leander, Georgetown, Pflugerville, Hutto, Manor, Buda, Kyle, Bee Cave, Lakeway, West Lake Hills, Dripping Springs.

How do you price a project?

Every job is walked and bid onsite. After the walk we send an itemized fixed bid that lists the scope line by line with one lump-sum total. Because custom homes, remodels, and commercial spaces vary so much, we don't publish price ranges; the bid is built from your site and your scope.

Do you provide itemized proposals?

Yes. Every proposal lists scope line by line with a single lump-sum total, so you can see exactly what is included.

Do you use subcontractors?

Our in-house crews self-perform demolition, framing, drywall, concrete, finish carpentry, and most finishes. Electrical, plumbing, and HVAC are performed by licensed trade partners as Texas requires.

Can you handle permits?

Yes. We prepare and submit permit packages and coordinate inspections with the city or county.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate