StealthGeneral Contracting
Call

Projects · Custom cabinetry

Custom cabinets, vanities, and closets

Cabinetry from Austin-area remodels and new homes: walnut and flat-panel modern kitchens, two-tone and white shaker kitchens, bath vanities and linen towers, and a walk-in closet. Our crew builds, sets, and finishes the cabinets, then coordinates tops, tile, plumbing, and electrical.

Custom cabinets, vanities, and closets, custom cabinetry by Stealth General Contracting
TypeKitchen cabinets, islands, vanities, closets
LocationAustin area, TX
StylesWalnut, flat-panel modern, shaker, two-tone
RoomsKitchens, baths, closets

Modern kitchen · 01

Flat-panel kitchen: cabinet boxes

Base and wall cabinet boxes built to the room's exact dimensions, including corner and sink bases.

Base cabinet boxes with corner unit and open wall cabinets, custom cabinetry by Stealth General Contracting
Base cabinet boxes with corner unit and open wall cabinets
Base cabinet run set level under the window, custom cabinetry by Stealth General Contracting
Base cabinet run set level under the window

Modern kitchen · 02

Flat-panel kitchen: pantry and appliance wall

Floor-to-ceiling cabinet wall framing the refrigerator, wall-oven column, and upper storage.

Tall pantry and appliance wall boxes before fronts, custom cabinetry by Stealth General Contracting
Tall pantry and appliance wall boxes before fronts

Modern kitchen · 03

Flat-panel kitchen: island and fronts

A long island with drawer banks, and slab fronts cut so the grain runs continuously across each run.

Island drawer fronts installed with grain running across, custom cabinetry by Stealth General Contracting
Island drawer fronts installed with grain running across

Modern kitchen · 04

Flat-panel kitchen: finished

Fronts, quartz countertops, tile backsplash, and appliances in place.

Finished island with quartz top and full cabinet wall, custom cabinetry by Stealth General Contracting
Finished island with quartz top and full cabinet wall
Finished sink run with upper cabinets and dishwasher panel, custom cabinetry by Stealth General Contracting
Finished sink run with upper cabinets and dishwasher panel

Shaker kitchen and bath

White shaker kitchen and island

An open-plan kitchen with a large working island, a raised breakfast bar with seating, and full-height wall cabinets.

Open-plan white shaker kitchen with two islands, custom cabinetry by Stealth General Contracting
Open-plan white shaker kitchen with two islands
Breakfast bar seating and white shaker cabinets, custom cabinetry by Stealth General Contracting
Breakfast bar seating and white shaker cabinets

Shaker kitchen and bath

Primary-bath vanity with makeup desk

A double vanity with a lowered makeup desk between the sinks, drawer banks, and matte-black hardware.

Double vanity with center makeup desk, custom cabinetry by Stealth General Contracting
Double vanity with center makeup desk
Vanity alongside the freestanding tub and walk-in shower, custom cabinetry by Stealth General Contracting
Vanity alongside the freestanding tub and walk-in shower

Walnut kitchen

Walnut and black kitchen with waterfall island

Walnut slab-front cabinets paired with black tall cabinets, a marble waterfall island, and a full-height stone backsplash behind the range.

Marble waterfall island with walnut and black cabinetry, custom cabinetry by Stealth General Contracting
Marble waterfall island with walnut and black cabinetry
Walnut uppers and bases around the range and hood, custom cabinetry by Stealth General Contracting
Walnut uppers and bases around the range and hood

Two-tone kitchen

Two-tone kitchen and black shaker station

Black cabinetry with natural-wood accents, a seated island, stacked wall ovens, and a black shaker station with natural wood bases under a marble backsplash.

Two-tone kitchen with black island and natural wood uppers, custom cabinetry by Stealth General Contracting
Two-tone kitchen with black island and natural wood uppers
Black shaker uppers over natural wood bases with marble backsplash, custom cabinetry by Stealth General Contracting
Black shaker uppers over natural wood bases with marble backsplash

Bathrooms

Bath vanities and linen tower

Black double vanities under a cedar ceiling, and a painted shaker linen tower recessed flush into a stone-slab bathroom wall.

Black double vanities with lit mirrors and cedar ceiling, custom cabinetry by Stealth General Contracting
Black double vanities with lit mirrors and cedar ceiling
Painted shaker linen tower set flush into a stone-slab wall, custom cabinetry by Stealth General Contracting
Painted shaker linen tower set flush into a stone-slab wall

Closets

Walk-in closet built-ins

Floor-to-ceiling closet cabinetry with glass-front doors, drawer stacks, hanging sections, and open shoe shelving.

Walk-in closet with glass doors, drawers, and shoe shelves, custom cabinetry by Stealth General Contracting
Walk-in closet with glass doors, drawers, and shoe shelves

Shaker kitchen, install

Shaker kitchen with granite tops

White shaker base and wall cabinets set and protected through construction, with dark granite tops and an undermount sink, plus a peninsula-style island.

Base and wall cabinets set before countertops, custom cabinetry by Stealth General Contracting
Base and wall cabinets set before countertops
Granite tops installed on the sink run, custom cabinetry by Stealth General Contracting
Granite tops installed on the sink run
Island with granite top and wall cabinets behind, custom cabinetry by Stealth General Contracting
Island with granite top and wall cabinets behind
Undermount stainless sink in dark granite, custom cabinetry by Stealth General Contracting
Undermount stainless sink in dark granite

Questions

Common questions

Do you build and install custom cabinets?

Yes. We build and install cabinetry sized to the room, including base and wall cabinets, tall pantry and oven walls, islands, and bathroom vanities.

What cabinet styles do you build?

Both modern flat-panel slab fronts with matched wood grain and classic white shaker doors, finished with the hardware, countertops, and backsplash you choose.

Do you build bathroom vanities too?

Yes. Double vanities, makeup desks, linen towers, and drawer banks, coordinated with plumbing, tile, mirrors, and lighting.

Do you build closet and linen cabinetry?

Yes. Walk-in closet systems with drawers, glass doors, hanging and shoe storage, plus linen towers built flush into bathroom walls.

Do you handle countertops and backsplash?

Yes. We coordinate quartz or granite tops, tile, plumbing, and electrical so the whole kitchen or bath is built under one contract.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate