Georgetown, Texas
General contractor in Georgetown
Remodels, additions, custom homes, and commercial work in Georgetown, including Old Town and Downtown properties in the historic overlay. We plan the permit and any historic review into the schedule from the start.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Building in Georgetown
What to know before you build or remodel in Georgetown
Permits go through Georgetown Building Inspections. The city requires a permit to construct, enlarge, alter, repair, move, or demolish a building, or to install or replace electrical, gas, mechanical, or plumbing systems, and that includes remodels with plumbing or electrical work (City of Georgetown). Applications, plan review, and inspection scheduling run through the city's online MGO system (City of Georgetown). We prepare and submit the package and meet the inspectors.
Outside city limits can still mean a city permit. If a property is in the ETJ or county but the City of Georgetown provides its water, wastewater, or electric service, city building permits still apply. We check this before pricing so there are no surprises.
Historic overlays add a review step. Projects in Georgetown's historic overlay districts, including Downtown and Old Town, go through a Certificate of Appropriateness reviewed by the Historic Preservation Officer or the Historic and Architectural Review Commission (HARC) (City of Georgetown). Exterior changes such as siding, windows, doors, roofs, and additions are part of that review, and the building permit follows the approval. We build that time into the schedule.
Commercial work. We work as both a commercial and a residential general contractor in Georgetown. Tenant finish-outs and commercial remodels in Georgetown need commercial plan review, and projects of $50,000 or more also need TDLR accessibility registration and review. See our commercial tenant finish-out services.
Nearby work
Recent work near Georgetown

Andy's Frozen Custard, Round Rock
Concrete paving, drive-thru lanes, curbs, sidewalks, and storefront flatwork.
View project →
Cedar Park storage facility
All concrete on a self-storage facility: retaining walls, footings, slabs, and paving.
View project →
Custom cabinets, vanities, and closets
White oak, walnut, black, and shaker kitchens, islands, bath vanities, and linen towers.
View project →Services in Georgetown
Custom Homes in Georgetown
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →Design-Build in Georgetown
One contract from first sketch to final walkthrough.
Learn more →Full Home Remodeling in Georgetown
Whole-home, kitchen, bath, and addition remodels.
Learn more →Commercial Tenant Finish-Out in Georgetown
Office, retail, restaurant, and medical suites built to lease.
Learn more →Custom Cabinetry in Georgetown
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →Civil & Site Work in Georgetown
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Nearby
Also serving
Questions
Common questions
Do I need a permit to remodel in Georgetown, TX?
If the work alters the structure or adds or replaces electrical, gas, mechanical, or plumbing systems, yes. Remodels with plumbing or electrical work need a permit. We prepare and submit it through the city's online system.
Do you work on homes in Old Town or Downtown Georgetown?
Yes. Exterior changes in Georgetown's historic overlay districts need a Certificate of Appropriateness before the building permit, and we plan the design and schedule around that review.
Are you a commercial general contractor in Georgetown, TX?
Yes. We build tenant finish-outs, commercial remodels, and site work in Georgetown, including permitting, TDLR accessibility registration when required, and inspections through certificate of occupancy.
Do you also do residential work in Georgetown?
Yes. We remodel homes, build additions and custom homes, and build custom cabinetry in Georgetown, including Old Town properties in the historic overlay.
How do I get an estimate?
Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.