StealthGeneral Contracting
Call

Projects

Our work, phase by phase

Finished kitchens and homes, additions and remodels in progress, ground-up commercial buildings, and the concrete and civil work underneath them. Every project page shows the build from start to finish.

Show projects
5,500 SF custom home build by Stealth General Contracting

ResidentialCentral Texas

5,500 SF custom home build

A 5,500 SF ground-up custom home: board and batten, stone, cedar porches, septic, and flatwork.

View project →
Custom cabinets, vanities, and closets by Stealth General Contracting

ResidentialAustin area

Custom cabinets, vanities, and closets

Walnut, flat-panel modern, two-tone, and shaker kitchens, vanities, a linen tower, and closet built-ins.

View project →
The Wesson Residence, in progress by Stealth General Contracting

ResidentialAustin

The Wesson Residence, in progress In progress

A five-level, 6,500 SF hillside home renovated top to bottom: windows, kitchens, baths, plaster, stucco, and pool.

View project →
Two condos on Vargas Street by Stealth General Contracting

ResidentialAustin

Two condos on Vargas Street

Design-build infill: design, demolition, and two new homes through finished exteriors.

View project →
Pool house addition, in progress by Stealth General Contracting

ResidentialHutto

Pool house addition, in progress In progress

1,200 SF of new living space added onto an existing pool house.

View project →
Old barn remodel, in progress by Stealth General Contracting

ResidentialAustin

Old barn remodel, in progress In progress

A full gut of an old barn: all-new MEPs, structural support, envelope, siding, and metal roof.

View project →
Wahoo's Fish Tacos, South Shore by Stealth General Contracting

CommercialSouth Shore, Austin

Wahoo's Fish Tacos, South Shore

Ground-up restaurant and bar, from a cleared lot to opening day.

View project →
Avenue N commercial site work by Stealth General Contracting

Commercial · CivilAvenue N

Avenue N commercial site work

Concrete site walls, retaining wall, drainage, sidewalks, curbs, asphalt paving, and striping.

View project →
Andy's Frozen Custard, Round Rock by Stealth General Contracting

Commercial · CivilRound Rock

Andy's Frozen Custard, Round Rock

Concrete paving, drive-thru lanes, curbs, sidewalks, and storefront flatwork.

View project →
Cedar Park storage facility by Stealth General Contracting

Commercial · CivilCedar Park

Cedar Park storage facility

All concrete on a self-storage facility: retaining walls, footings, slabs, and paving.

View project →
30,000 SF slab poured in one day by Stealth General Contracting

Commercial · CivilCommercial concrete

30,000 SF slab poured in one day

A 30,000 SF slab placed in one day, with heavy spread footings and 88 anchor bolt sets.

View project →
Supermarket site earthwork by Stealth General Contracting

Commercial · CivilAustin

Supermarket site earthwork

Demolition, mass excavation, fill and compaction, and a finished building pad.

View project →
Failed retaining wall, apartment building by Stealth General Contracting

CivilStructural repair

Failed retaining wall, apartment building

Shored an occupied building, stabilized the slab with flowable fill, and built a new wall.

View project →
Oltorf apartments retaining walls and paving by Stealth General Contracting

CivilOltorf, Austin

Oltorf apartments retaining walls and paving

Failing retaining walls demolished and rebuilt, and concrete paving repaired.

View project →
City of Buda skate park by Stealth General Contracting

CivilCity of Buda

City of Buda skate park

A public concrete skate park: bowl, banks, ledges, stair set, rails, and planters.

View project →

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate