Project · Vargas Street, Austin

A house and an ADU on Vargas Street, set up as two condos

An Austin infill development we took from an old house on a single lot to two finished homes: we designed and built a new main house and an accessory dwelling unit (ADU), then created a condominium regime so each home can be owned, financed, and sold on its own.

A house and an ADU on Vargas Street, set up as two condos, Vargas Street house and ADU development in Austin
TypeInfill development: main house + ADU, two-unit condo regime
LocationVargas St, Austin, TX
ScopeDesign, demolition, new construction, condo regime

The development

How the development worked

  1. One lot, two homes

    The property started as a single lot with one older house. We designed a new main house and a detached ADU, each with its own garage, sized to fit the setbacks and to save the mature trees.

  2. Built as a pair

    We demolished the old house and built both homes together: foundations, two-story framing, Zip sheathing, siding, rough-in, drywall, and finishes, then a shared driveway between them.

  3. Condo regime

    Then we turned the lot into a two-unit condominium regime. Under the Texas Uniform Condominium Act, a recorded declaration with certified plats and plans defines each home as its own unit, the shared driveway and yard as common elements, and an owners association to run them.

  4. Two homes to sell

    With the regime recorded, the house and the ADU are separate properties. Each can carry its own mortgage and sell to its own buyer, instead of being one house with a rental out back.

Phase 01

Design

3D model of both homes used to set layout, massing, and budget before permitting, with the two units placed to work as separate condos later.

3D design model of the main house and ADU, Vargas Street house and ADU development in Austin
3D design model of the main house and ADU

Phase 02

Demolition and site prep

Removing the existing house, protecting the mature trees on site, and preparing the pads.

Existing house before demolition, Vargas Street house and ADU development in Austin
Existing house before demolition
Excavator demolishing the existing house, Vargas Street house and ADU development in Austin
Excavator demolishing the existing house
Clearing demolition debris, Vargas Street house and ADU development in Austin
Clearing demolition debris
Tree protection wrap on a mature tree, Vargas Street house and ADU development in Austin
Tree protection wrap on a mature tree
Site cleared and sand placed for the building pads, Vargas Street house and ADU development in Austin
Site cleared and sand placed for the building pads

Phase 03

Foundation

Forming, vapor barrier, and slab pours for both homes.

Foundation forms and beams, Vargas Street house and ADU development in Austin
Foundation forms and beams
Vapor barrier and form boxes before the pour, Vargas Street house and ADU development in Austin
Vapor barrier and form boxes before the pour
Finished slab with framing starting on the second home, Vargas Street house and ADU development in Austin
Finished slab with framing starting on the second home

Phase 04

Framing

Two-story wood framing for the main house and the ADU.

Wall framing on the first floor, Vargas Street house and ADU development in Austin
Wall framing on the first floor
Second-floor walls and stairwell framing, Vargas Street house and ADU development in Austin
Second-floor walls and stairwell framing
Framing the garage opening, Vargas Street house and ADU development in Austin
Framing the garage opening
Main house framing with the sheathed ADU behind it, Vargas Street house and ADU development in Austin
Main house framing with the sheathed ADU behind it
Second-story framing and roof trusses, Vargas Street house and ADU development in Austin
Second-story framing and roof trusses

Phase 05

Building envelope

Zip System sheathing, windows, lap and board-and-batten siding, trim, and exterior paint.

Zip System sheathing and window openings, Vargas Street house and ADU development in Austin
Zip System sheathing and window openings
Sheathed ADU with garage opening, Vargas Street house and ADU development in Austin
Sheathed ADU with garage opening
Taped Zip sheathing on both stories, Vargas Street house and ADU development in Austin
Taped Zip sheathing on both stories
Siding going on over the garage, Vargas Street house and ADU development in Austin
Siding going on over the garage
Siding meeting the sheathed wall at the fence line, Vargas Street house and ADU development in Austin
Siding meeting the sheathed wall at the fence line
Siding and trim installed, Vargas Street house and ADU development in Austin
Siding and trim installed
Upper window and siding detail, Vargas Street house and ADU development in Austin
Upper window and siding detail
Entry door and windows trimmed out, Vargas Street house and ADU development in Austin
Entry door and windows trimmed out
Painted siding and trimmed windows, Vargas Street house and ADU development in Austin
Painted siding and trimmed windows
Finished paint on the two-story wall, Vargas Street house and ADU development in Austin
Finished paint on the two-story wall
Painting the exterior above the garage, Vargas Street house and ADU development in Austin
Painting the exterior above the garage

Phase 06

Rough-in

Plumbing, HVAC ductwork, and electrical run through the floor and wall framing, with licensed partners on the licensed trades.

HVAC ducts and electrical in the floor framing, Vargas Street house and ADU development in Austin
HVAC ducts and electrical in the floor framing
Plumbing drains and ductwork before drywall, Vargas Street house and ADU development in Austin
Plumbing drains and ductwork before drywall

Phase 07

Drywall and interiors

Drywall hung throughout both homes, then floors, cabinets, and finishes.

Drywall hung with plumbing stubbed out for the bath, Vargas Street house and ADU development in Austin
Drywall hung with plumbing stubbed out for the bath
Ceiling drywall with recessed light cutouts, Vargas Street house and ADU development in Austin
Ceiling drywall with recessed light cutouts
Drywall at the stair and entry, Vargas Street house and ADU development in Austin
Drywall at the stair and entry
Stair and laundry nook after drywall, Vargas Street house and ADU development in Austin
Stair and laundry nook after drywall
Bedroom with drywall hung and board staged, Vargas Street house and ADU development in Austin
Bedroom with drywall hung and board staged
Upstairs room with clerestory windows, Vargas Street house and ADU development in Austin
Upstairs room with clerestory windows
Drywall complete on the ground floor, Vargas Street house and ADU development in Austin
Drywall complete on the ground floor
Finished floors and kitchen cabinets installed, Vargas Street house and ADU development in Austin
Finished floors and kitchen cabinets installed

Phase 08

Finished homes

Completed exteriors, garages, and the shared driveway.

Finished exterior with siding and trim, Vargas Street house and ADU development in Austin
Finished exterior with siding and trim
Completed rear home and garage, Vargas Street house and ADU development in Austin
Completed rear home and garage
Shared driveway poured between the two homes, Vargas Street house and ADU development in Austin
Shared driveway poured between the two homes
Both finished homes with driveway and lawn, Vargas Street house and ADU development in Austin
Both finished homes with driveway and lawn

Questions

Common questions

What is a condo regime?

A condominium regime is a legal structure that splits one property into separately owned units plus shared common elements. In Texas it is created under the Uniform Condominium Act (Property Code Chapter 82) by recording a declaration with plats and plans, and an owners association manages the shared areas.

Why build a house and an ADU and then create a condo regime?

Without a regime, the ADU stays tied to the main house, so it can only be rented. With a two-unit regime, each home has its own deed and can be financed and sold to a separate buyer, which is how this kind of infill project pencils out.

Can you build two homes on one Austin lot?

Many Austin residential lots allow more than one home, but it depends on zoning, lot size, setbacks, impervious cover, and trees. We check those during design, before permits are filed.

Do you handle demolition and tree protection?

Yes. Our crews demolish existing structures, clear the site, and protect trees that need to stay.

Can you help investors with infill development in Austin?

Yes. We price as we design so the project pencils before permits are filed, build it with our own crews, and plan the unit layout around the condo regime from the start.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate