Cedar Park, Texas
General contractor in Cedar Park
Remodels, additions, custom homes, cabinetry, and commercial work in Cedar Park. We poured all the concrete on a Cedar Park self-storage facility, and we handle the city's contractor registration and permits for every job.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Building in Cedar Park
How permits work in Cedar Park
What needs a permit. Cedar Park requires a permit for any construction that physically changes or adds structures on a property, including additions, remodels that move or remove interior walls or change electrical, mechanical, or plumbing, accessory buildings, pools, HVAC equipment, and water heaters. Painting, carpet, cabinets, wallpaper, and non-structural roof covering generally do not need one (City of Cedar Park).
Every contractor registers with the city. All contractors working in Cedar Park must register through the city's MGO Connect portal, where permits are also applied for, paid, and inspected (Cedar Park Building Permits & Inspections). We handle registration and the application so your job isn't held up.
Remodel and addition plans. The city's remodel/addition checklist asks for before-and-after floor plans showing new walls, doors, and windows with electrical, plumbing, and mechanical details, plus framing plans for any roof tie-in (Cedar Park submittal checklist). We draw those as part of our design-build process.
Timing. The city says residential permits are generally issued in 5 to 7 business days, and inspections requested before 3 pm go on the next business day's schedule (Cedar Park FAQ). Commercial finish-out reviews take longer; see commercial tenant finish-out.
Codes and trees
Cedar Park codes are not Austin's codes
Older code editions. Cedar Park builds to the 2021 International Residential, Building, Fire, Plumbing, Mechanical, Energy, and Existing Building Codes and the 2020 National Electrical Code, all with local amendments, effective June 1, 2022 (Cedar Park Building Permits & Inspections). Austin now uses the 2024 codes, so details that pass in Austin aren't automatically right here, and the reverse. We check plans against the edition Cedar Park adopted.
Heritage trees. A hardwood with a trunk of 26 inches in diameter or more is a heritage tree in Cedar Park. The city's code counts pruning more than 30 percent of a tree's viable crown as removal, and treats a tree as removed if a plan shows more than half of its dripline disturbed (Cedar Park Code, definitions). On wooded lots off Brushy Creek and in the older neighborhoods, that can decide where an addition or new home goes.
Room to move the house. In the city's single-family districts, front, side, and rear setbacks can be reduced by up to 5 feet to shift a building and save a protected or heritage tree, with the administrator's approval (Cedar Park Code, lot standards). Asking for that is often easier than a removal.
Mitigation adds up. When trees are removed during subdivision or site development, the city's fee in lieu of replanting was raised to $450 per inch for heritage trees, with lower rates for smaller trees (Community Impact). For how root zones shape a design, see our guide to building around heritage trees.
Commercial work in Cedar Park
Finish-outs, fire inspections, and certificates of occupancy
Every new tenant needs a C.O. Cedar Park requires a certificate of occupancy for a new building, a lease-space finish-out, or any commercial remodel, and also when the tenant, the business name, or the ownership changes, or the use moves into a different occupancy classification. When a building permit is issued, the C.O. is included with it (Cedar Park Certificate of Occupancy).
Utilities wait on the C.O. application. The city won't release utilities in a new tenant's name until a C.O. application has been received. A stand-alone C.O. review is routed to Building, Planning, Industrial Pretreatment, and the Fire Marshal and typically takes about a week (City of Cedar Park).
The Fire Marshal inspects twice on wood-framed work. After all trade rough-ins pass and before insulation or drywall, the Fire Marshal's Office does a top-plate inspection to confirm penetrations are sealed with approved firestop. Rated firewalls are also inspected by the Fire Marshal (Cedar Park inspection guideline).
Move furniture in before the fire final. The final fire inspection checks exit paths, extinguishers, exit doors and hardware, addressing, the Knox box, exit signs and emergency lighting, sprinkler heads, duct smoke detectors, and fire lanes. Furniture and fixtures need to be in place so egress can be verified (Cedar Park Fire Marshal's packet). The building final comes first, after every trade has its own final (inspection guideline).
Restaurant tenants should also plan for the hood suppression permit and the city's industrial pretreatment review. Over $50,000 in construction, a Texas finish-out also needs TDLR accessibility review. See how the pieces line up in our tenant finish-out timeline and certificate of occupancy guide.
Local work
Our work in and around Cedar Park

Cedar Park storage facility
All concrete on a self-storage facility: retaining walls, footings, slabs, and paving.
View project →
Custom cabinets, vanities, and closets
White oak, walnut, black, and shaker kitchens, islands, bath vanities, and linen towers.
View project →
Andy's Frozen Custard, Round Rock
Concrete paving, drive-thru lanes, curbs, sidewalks, and storefront flatwork.
View project →Services in Cedar Park
Custom Homes in Cedar Park
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →Design-Build in Cedar Park
One contract from first sketch to final walkthrough.
Learn more →Full Home Remodeling in Cedar Park
Whole-home, kitchen, bath, and addition remodels.
Learn more →Commercial Tenant Finish-Out in Cedar Park
Office, retail, restaurant, and medical suites built to lease.
Learn more →Custom Cabinetry in Cedar Park
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →Civil & Site Work in Cedar Park
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Nearby
Also serving
Questions
Common questions
Do I need a permit to remodel in Cedar Park?
If you move or remove interior walls, or change electrical, mechanical, or plumbing, yes. Cosmetic work like paint, carpet, and cabinet replacement generally does not. We confirm with the city before pricing.
Do contractors have to register in Cedar Park?
Yes. All contractors must register with the City of Cedar Park through MGO Connect. There is no fee, and we handle it for our crew and trade partners.
What building code does Cedar Park use?
Cedar Park adopted the 2021 International Residential, Building, Fire, Plumbing, Mechanical, Energy, and Existing Building Codes and the 2020 National Electrical Code, with local amendments, effective June 1, 2022. That is an older edition than the 2024 codes Austin uses.
What is a heritage tree in Cedar Park?
A hardwood tree with a trunk of 26 inches in diameter or more, or a tree or stand the City Council designates for historical or community value. Pruning more than 30 percent of a tree's viable crown counts as removal under the city code.
Do I need a certificate of occupancy for a lease space in Cedar Park?
Yes. Cedar Park requires a certificate of occupancy for a lease-space finish-out or commercial remodel, and for a new tenant, a business name or ownership change, or a change in occupancy classification. If a building permit is issued, the C.O. comes with it.
What does the Cedar Park Fire Marshal check before opening?
Exit paths, fire extinguishers, exit doors and locks, addressing, the Knox box, exit signs and emergency lighting, sprinkler heads, duct smoke detectors, and fire lanes. Furniture and fixtures should be in place so the inspector can verify egress.
How long does a Cedar Park residential permit take?
The city says residential permits are generally issued in 5 to 7 business days once a complete submittal is in. Incomplete plans are the most common cause of delay.
Can I use a VA loan to build with you in Cedar Park?
Yes, if your lender offers VA construction financing and accepts us through its builder review. Since March 31, 2025, the VA no longer requires a builder ID for most new construction loans. Builders sign the VA one-year warranty, Form 26-1859, at closing. See our guide to VA approved builders in Central Texas at stealthgctx.com/blog/va-approved-builders-central-texas/.
How do I get an estimate?
Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.