StealthGeneral Contracting
Call

Bee Cave, Texas

General contractor in Bee Cave

Luxury custom homes, whole-home remodels, custom cabinetry, hillside site work, and commercial tenant finish-outs in Bee Cave, including our current work at Hill Country Galleria. Between the Hill Country terrain, the oak trees, impervious cover limits, and the city's dark-sky lighting rules, a lot is decided before the first drawing, so we start with an onsite walk.

Steel stud framing going up inside a commercial shell space by Stealth General Contracting
Tenant finish-out framing at Hill Country Galleria in Bee Cave

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Bee Cave

What to know before you build, remodel, or finish out a space in Bee Cave

Contractor registration. All contractors and subcontractors must register with the City of Bee Cave before receiving building permits. Registration is good for one year, and plumbing, electrical, and mechanical contractors include their professional licenses.

A broad permit list. Besides new construction, additions, and remodels that move walls or change electrical, mechanical, or plumbing, Bee Cave lists roof replacement, retaining walls over 4 feet, decks over 200 square feet or more than 30 inches above grade, HVAC and water heater replacement, finishing an attic or converting a garage, and window replacement that alters framing.

Which codes apply. Bee Cave builds to the 2015 International Building, Mechanical, Plumbing, and Fuel Gas Codes, the 2015 International Fire Code with Lake Travis Fire Rescue amendments, and the 2017 National Electrical Code, adopted by Ordinance 484 in June 2022. That is older than the editions Austin uses, so we check details against Bee Cave's adopted codes rather than assuming Austin rules carry over.

New tenant, new permit. A change of occupant, a new tenant lease space, or a change of use needs a permit in Bee Cave, even in an existing shopping center. Work goes through the city's MyGovernmentOnline (MGO Connect) portal, with construction drawings uploaded as part of the application. See our commercial finish-out work, including the Hill Country Galleria finish-out now underway.

Certificate of occupancy checklist. Before a business opens, the city's certificate of occupancy application calls for a Zoning Use Determination Questionnaire, a floor plan showing egress routes and restrooms, an owner's statement that no unpermitted demolition, building, electrical, plumbing, or HVAC work was done in the space, and a Lake Travis Fire Rescue occupancy inspection approval. Everything uploads at once, and the city allows 7 to 10 business days to process it.

Fire inspections go through LTFR. The City of Bee Cave does not do fire inspections. Those are scheduled directly with Lake Travis Fire Rescue, so we build that step into the finish-out schedule alongside the city's building inspections and the state's TDLR accessibility review.

Inspections by 3 p.m. Building inspections are requested through MGO; requests made by phone or email are not processed. Requests in by 3 p.m. are scheduled for the next day, and any failed-inspection fees must be paid before a final inspection can be scheduled.

Impervious cover limits. Bee Cave's development code caps impervious cover on new development at 40% of the net site area, and many planned-development zoning ordinances set their own limits. Single-family development over 20% impervious cover needs water-quality controls sized to treat it. Driveways, patios, and pool decks all count, so we check the lot's remaining cover before designing an addition or outdoor living space.

Oak trees and timing. Tree removal and trimming can require a city permit, so we verify city or ETJ status and the tree-permit requirements that apply to your lot before any clearing. Oak trees can't be removed or trimmed from February 1 through July 1 without a waiver. We schedule clearing and site work around that window.

Dark-sky lighting. Bee Cave became Texas's seventh DarkSky Community in April 2023 and adopted lighting rules for both residential and commercial development. We pick exterior fixtures that meet them.

Source: City of Bee Cave: Building · Inspections · Certificate of occupancy checklist · Development codes and regulations · UDC impervious cover (sec. 7.3.2) · DarkSky Community · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Bee Cave

See all projects →

Services in Bee Cave

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do I need a permit to finish out a lease space in Bee Cave?

Yes. Bee Cave requires a permit for a change of occupant, a new tenant lease space, or a change of use, and for remodels that move walls or change electrical, mechanical, or plumbing. Before opening, the business also needs a certificate of occupancy, which includes a Lake Travis Fire Rescue occupancy inspection. Commercial spaces may also need state accessibility (TDLR) registration and review.

Who does fire inspections in Bee Cave?

Lake Travis Fire Rescue. The city does not facilitate fire inspections, so they are scheduled directly with LTFR, and its occupancy inspection approval is part of the city's certificate of occupancy checklist.

Does Bee Cave issue business licenses?

No. The city's certificate of occupancy checklist notes that Bee Cave does not issue business licenses and points businesses to the Texas Department of Licensing and Regulation for state licensing requirements.

How much of my lot can I cover in Bee Cave?

It depends on the lot. The city's development code caps impervious cover on new development at 40% of net site area, and many neighborhoods have their own planned-development limits. Single-family development over 20% needs water-quality controls. We check your survey and the zoning before designing.

Can I remove an oak tree on my Bee Cave lot?

We verify city or ETJ status and the tree-permit requirements that apply to your lot before any clearing, and oaks can't be removed or trimmed from February 1 through July 1 without a waiver. We plan the footprint and the clearing schedule around the trees.

Does a new roof need a permit in Bee Cave?

Yes. Bee Cave lists roof replacement among the work that needs a permit, along with retaining walls over 4 feet and window replacement that alters framing.

Do outdoor lights have to meet dark-sky rules in Bee Cave?

Yes. As a DarkSky Community, Bee Cave has lighting regulations for residential and commercial development. We specify fixtures that comply.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate