Project · Hill Country Galleria, Bee Cave
Tenant finish-out at Hill Country Galleria, in progress
Active commercial tenant finish-out work at Hill Country Galleria in Bee Cave, just west of Austin. In a restaurant space we tore out the old counters and are framing a new bar in light-gauge steel, and in a client's shell space our crew is framing full-height steel stud walls up to the roof deck. The restaurant's walls, bar front, columns, and built-in shelving are now painted, and the black ceiling paint was dropped down onto the front fur-down. We'll add photos as the work moves forward.

Video
Watch the project on YouTube
Phase 01
Steel stud framing
Full-height light-gauge steel stud walls run to the underside of the roof deck in a client's shell space, framed off a scissor lift before MEP rough-in and drywall.



Phase 02
The existing restaurant space
The dining room and back bar before the bar rebuild.


Phase 03
Counter demolition
The old wood counters came out, leaving the plumbing stub-outs and floor drains to lay the new bar out around.


Phase 04
New bar framing
The new bar die wall is framed in light-gauge steel on top of the existing knee wall, ready for the counter and finishes.


Phase 05
Interior painting
The dining room, bar front, columns, and built-in shelving are painted in the new green, and the black ceiling paint was dropped down to cover the front fur-down. The bar top material is staged on the counter, and the restroom and back hallway are finished.







Questions
Common questions
Do you build tenant finish-outs at shopping centers like Hill Country Galleria?
Yes. We are working on finish-out at Hill Country Galleria in Bee Cave now, including steel stud framing and a restaurant bar rebuild, and we coordinate with property management on access, scheduling, and landlord requirements.
Do you frame with light-gauge steel?
Yes. Our crews frame commercial walls, bar die walls, and soffits in light-gauge steel studs, including full-height walls up to the roof deck.
Can you remodel an existing restaurant bar?
Yes. We demolish the old counters, lay the new bar out around the existing plumbing and floor drains, and frame it in steel, with licensed partners for plumbing and electrical.
Who issues permits at Hill Country Galleria?
The Galleria is in the City of Bee Cave, so commercial building permits and inspections go through Bee Cave, not Austin. We confirm requirements for the specific suite before we bid.