Full Home Remodeling · Steam Shower Installation
Steam shower installation in Austin, TX
A steam shower is a tile shower built to a much stricter standard: sealed on every surface, closed to the ceiling, and fed by a generator on its own circuit. We build them as part of a bathroom remodel, from framing and vapor-proof waterproofing to the glass, with licensed electrical and plumbing partners on the same schedule.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Steam Shower Installation services
Vapor-proof waterproofing
A steam-rated, low-perm membrane on the floor, walls, bench, and ceiling, with every valve, niche, and steam head penetration sealed into it.
Sloped ceilings
A tiled ceiling pitched so condensation runs to the wall instead of dripping on you, dropped to about 8 feet in tall bathrooms so the room heats faster.
Glass to the ceiling
Frameless glass or a header wall that closes the enclosure, a sealed door that swings out, and an operable transom or outside fan to clear the steam.
Generators sized for the room
Sized to the enclosure's volume, ceiling height, glass, and stone, placed in a dry, reachable spot with a drain pan and a flushing plan for hard water.
Steam heads, benches, and controls
The steam head low on the wall and away from the bench, a tiled bench sloped to drain, and controls you can reach while seated.
Rain heads, body sprays, and lighting
Ceiling rain heads, wall sprays, linear drains, and shower lighting built into the same enclosure, so it works as well as a shower as it does as a steam room.
How we build a steam shower
Steam shower installation at a glance
| Item | How we handle it |
|---|---|
| Waterproofing | Steam-rated membrane on every surface, ceiling included, with a vapor retarder behind the board when the membrane requires it |
| Ceiling | Sloped tile ceiling, about 8 feet high inside the enclosure |
| Enclosure | Glass or a header wall to the ceiling, sealed out-swing door, transom or fan to clear steam |
| Generator | Sized to the enclosure; in a vanity, closet, or conditioned attic with service access and a drain pan |
| Power and water | Dedicated 208 or 240 volt circuit and water, drain, and safety-valve piping by licensed trades |
| Permits | New circuits and plumbing usually mean trade permits. We pull them and meet the inspectors (City of Austin: residential building permits) |
| Price | No published ranges. We walk the bathroom and send an itemized fixed bid with one lump-sum total |
Why steam needs a different build
Steam goes where water doesn’t. A normal shower only sheds water. A steam shower fills a closed room with hot vapor that pushes through grout and screw holes. The waterproofing has to stop vapor too, on the ceiling most of all. That layer is the part you never see and the part that decides whether the walls stay dry.
The room has to close. Glass that stops short of the ceiling, or a door with a gap above it, lets steam out as fast as the generator makes it. The enclosure needs to be sealed on every side.
The generator has to fit the room. An undersized generator is the main reason a steam shower heats slowly. Tall ceilings, exterior walls, lots of glass, and stone all add load. We size it to the enclosure and the manufacturer’s method, not to the bathroom.
Can my existing shower become a steam shower? Usually not without rebuilding it. If the walls have no vapor-rated membrane, they come down to the studs so the shower can be rebuilt correctly, and the ceiling and glass usually change too. The best time to add steam is during a full bathroom remodel.
For the full checklist, read our steam shower installation guide. Still deciding? See steam shower benefits.
Our work
Related projects and guides

Steam wet room remodel
A glass-enclosed steam wet room with a freestanding tub, porcelain slab walls, and a hex mosaic floor.
See the project →
Marble-look steam shower
Black-and-white porcelain floor to ceiling, a glass steam enclosure with a transom, and a tiled bench.
See the project →
Floor-to-ceiling glass steam shower
Tiled walls and ceiling, twin rain heads, linear drains, and glass to the ceiling.
See the project →
Steam shower installation guide
Membranes, slope, insulation, generator sizing, steam heads, and power, step by step.
Read the guide →Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Steam Shower Installation across Central Texas
Questions
Common questions
How much does a steam shower installation cost in Austin?
It depends on the size, ceiling height, tile, glass, and generator. We don’t publish price ranges. We walk the bathroom and send an itemized fixed bid with one lump-sum total.
Can you turn my existing shower into a steam shower?
Usually only by rebuilding it. The shower has to be sealed to the ceiling, and the walls need a vapor-rated membrane behind the tile. If yours doesn’t have one, the walls come down to the studs.
Where does the steam generator go?
Outside the shower, within the distance the manufacturer allows, in a dry, heated spot you can reach for service, such as a vanity cabinet, linen closet, or conditioned attic.
Do I need a permit for a steam shower in Austin?
Usually. The generator needs a new dedicated circuit and plumbing, which typically need trade permits. We pull the permits and schedule the inspections.
How long does a steam shower installation take?
It is built as part of a bathroom remodel, so the schedule follows the remodel. Waterproofing, flood testing, and tile take longer than a standard shower, and the glass is measured after tile. See our bathroom remodel timeline for the phases.
Who does the electrical and plumbing?
Licensed electricians and plumbers. Our crews handle the framing, waterproofing, tile, and finish work, and we run the schedule.