StealthGeneral Contracting
Call

Design-Build · Home Additions & ADUs

Home additions and ADUs in Austin, TX

Room additions, primary suites, second stories, guest houses, and ADUs, designed and built by one team. Our own crews pour the foundation, frame, and finish the addition so it ties into the house you already have.

Stucco exterior of a pool house addition under construction in Hutto, TX

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Home Additions & ADUs services

Room additions

Primary bedrooms, home offices, playrooms, and living-room expansions on a new foundation tied into the existing house.

Primary suite additions

Bedroom, bath, and closet added together, often the most requested addition in Austin.

Second-story additions

Adding a floor over the existing house, after an engineer confirms the foundation and framing can carry it.

ADUs and guest houses

Detached backyard cottages, garage apartments, and in-law suites built as separate dwelling units.

Garage conversions

Turning an attached or detached garage into finished, conditioned living space.

Pool house additions

Adding living space to an existing pool house or outbuilding. See our Hutto project.

Planning an addition

What an Austin addition has to clear

Zoning first. Setbacks, impervious cover, and building size limits decide how big the addition can be before design starts. We check them at the first visit.

ADUs and extra units. In Austin, a structure with habitable space, a full bathroom, and permanent cooking facilities is a dwelling unit and has to meet the zoning, utility meter, and address rules for one (City of Austin: additional dwelling units). Austin’s HOME amendments now allow up to three housing units on many single-family lots (City of Austin: HOME amendments).

Foundation and tie-in. The new foundation has to work with the old one, and the roof, siding, and floor heights have to line up. As a concrete contractor, we build the foundation ourselves and plan the tie-in from the start. The roof tie-in is where addition leaks most often start, so we frame, dry in, and flash it as one sequence; see how an addition roof tie-in should be flashed.

Converting instead of adding. If you have a garage, converting it can add living space without a new foundation or roof. Read our Austin garage conversion guide for the permit, parking, and floor area rules.

Permits. Additions need a residential building permit with plan review in Austin and most nearby cities (City of Austin: residential building permits). We assemble the drawings and engineering and submit. See our home addition timeline for every step.

Our work

Related projects and guides

All projects →

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Home Additions & ADUs across Central Texas

Questions

Common questions

How much does a home addition cost in Austin?

Size, foundation, how the roof ties in, and finishes drive it. We don’t publish per-square-foot numbers. We walk the property and send an itemized fixed bid with one lump-sum total.

Can I build an ADU on my Austin lot?

Often, yes. It depends on zoning, lot size, and utilities. Austin’s HOME amendments allow up to three units on many single-family lots. We check your lot before design starts.

Can you add a second story to my house?

Sometimes. An engineer has to confirm the existing foundation and walls can carry the new floor, or design reinforcement. We coordinate that review first.

Will the addition match my house?

That is the goal from day one: matching floor heights, roof pitch, siding, windows, and trim so it reads as one house.

Can we live in the house during an addition?

Usually. Most of the work happens outside the existing walls until the final tie-in, which we schedule as tightly as we can.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate