Commercial Tenant Finish-Out · Office Buildouts
Office build-out and custom office space contractor in Austin, TX
Office, retail, and medical suite buildouts in shell and second-generation space. We self-perform framing, drywall, ceilings, and finishes, price against your landlord’s work letter, and build to your move-in date.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Office Buildouts services
Office suite buildouts
Private offices, conference rooms, open work areas, break rooms, and reception.
Demising walls and partitions
Separating suites and framing the floor plan, including rated walls where code requires them.
Ceilings and lighting
Acoustic ceiling grid and tile, drywall ceilings, and lighting packages.
Restrooms and ADA upgrades
Accessible restrooms, routes, and entries to meet the Texas Accessibility Standards.
Retail and medical suites
Storefronts and sales floors, exam rooms, and plumbing at every room for clinics.
Flooring, millwork, and paint
Carpet tile, LVT, polished concrete, casework, and finishes.
Planning an office buildout
What decides an Austin office buildout
Shell or second-generation. A cold shell needs everything from restrooms to HVAC distribution. A second-generation office can often keep its ceiling grid, HVAC, and restrooms, which saves time and money. We walk the space before you sign.
Landlord work letter and TI allowance. We price landlord work and tenant work as separate lines so the allowance is applied correctly. See our TI allowance guide.
Accessibility. Commercial projects of $50,000 or more are registered with TDLR, reviewed by a Registered Accessibility Specialist, and inspected after construction (TDLR: architectural barriers at a glance).
Staying open. If you already occupy the space, we can phase work after hours or by area so your team keeps working. See what drives finish-out cost.
Our work
Related projects and guides
Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Office Buildouts across Central Texas
Questions
Common questions
How much does an office buildout cost in Austin?
Shell condition, how much can be reused, and the finish level drive it. We don’t publish ranges. We walk the suite and send an itemized fixed bid with landlord and tenant work separated.
How long does an office buildout take?
Permit review usually takes longer than construction for small suites. You get a schedule with the bid, built around your move-in date.
Do I need a permit for an office buildout in Austin?
Yes, for most work beyond paint and carpet. The city reviews building, fire, and energy code, and projects of $50,000 or more also need TDLR accessibility registration.
Can you work with my landlord’s TI allowance?
Yes. We price against the work letter line by line so the allowance covers what it should.
Can our office stay open during the work?
Often, yes, by phasing areas or working after hours. We plan it at the walk.