StealthGeneral Contracting
Call

Kyle, Texas

General contractor in Kyle

Custom homes, remodels, additions, custom cabinetry, and commercial finish-outs in Kyle and the I-35 corridor in Hays County. We walk the job, send an itemized fixed bid, and pull the Kyle permit ourselves.

Open-plan white shaker kitchen with two islands by Stealth General Contracting
White shaker kitchen, one of our custom cabinetry projects

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Kyle

How permits work in Kyle

What needs a permit. Kyle requires a permit before construction inside city limits, including new homes and commercial buildings, additions, and remodels that relocate or remove interior walls or change electrical, mechanical, or plumbing. The city also lists window and exterior door replacement, larger or attached patio covers, water heaters, irrigation, and solar. The exemption is narrow: a detached residential structure or deck under 200 square feet doesn't need one, but any deck 30 inches or more above grade does, and exempt work still has to meet city codes.

The contractor pulls the permit. The city says the contractor doing the work pulls the permit, is responsible for meeting code, and must carry liability insurance. The applicant and every subcontractor must be listed on the permit with a current city registration. On commercial jobs the general contractor pulls one permit and lists the plumber, electrician, and mechanical contractor.

Which codes apply. Kyle builds to the 2021 International codes, including the building, residential, plumbing, mechanical, fire, and energy codes, and the 2020 National Electrical Code.

HVAC and water heaters count. Most HVAC repairs and all new and replacement equipment need a permit, pulled by a contractor registered with the city and licensed by TDLR. State law requires the city to inspect water heater replacements, and the plumber must be registered with the city and licensed by the Texas State Board of Plumbing Examiners.

What an addition or remodel submittal needs. Kyle's checklist asks for a written scope of work and a full plan set. Additions also need a site plan showing easements, setbacks, a benchmark elevation, and drainage, plus Manual J, S, and D load calculations and an energy compliance report. Engineered foundation plans are required where applicable.

Impervious cover is tracked. Building permits include an impervious coverage addendum that totals roofed areas, driveways, sidewalks, uncovered patios, and AC pads, with uncovered wood decks counted at 50%. The form also states that all water must drain away from buildings on the site and on neighboring lots.

Expansive soils. Foundation repair needs a permit in Kyle, and because of the city's expansive soils the work requires an engineered design and a sealed engineer's letter at inspection.

Timing and expiration. The portal assigns an automated review due date, which the city says is not guaranteed. Most permits expire 180 days from issuance or from the last inspection.

HOAs are separate. The City of Kyle does not enforce HOA or deed restrictions, so a city permit doesn't mean the HOA has signed off. We check your deed restrictions and HOA requirements before applying.

Commercial finish-outs. Kyle's commercial checklist calls for sealed drawings, a code matrix and life-safety plan, and the TDLR Architectural Barriers registration number when a project meets the state's threshold. Demolition of 100 square feet or more needs an asbestos survey or architect's letter, and food establishments need plan review by Hays County Development Services. The Building Inspection Department issues the certificate of occupancy. See our TDLR accessibility review guide.

Online portal and utilities. Permits, plans, and inspections are applied for and paid through Kyle's Citizen Self-Service portal. Before digging, Texas 811 covers most utilities, but City of Kyle water, wastewater, and stormwater lines are not part of 811 and need a separate locate request to the city.

Source: City of Kyle: Building Services and Permits · The Building Permit Process · Residential additions, alterations and remodels checklist · Commercial plan review checklist · Impervious coverage form · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Kyle

See all projects →

Services in Kyle

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Who pulls the permit in Kyle, me or the contractor?

The contractor doing the work pulls it in Kyle, and every subcontractor has to be listed and registered with the city. We handle that for the whole team.

Do I need a permit for a shed or deck in Kyle?

Only in narrow cases. A detached accessory structure under 200 square feet with no utilities, or a detached deck under 200 square feet, is exempt. A deck 30 inches or more above grade needs a permit at any size, as do larger, attached, or wired and plumbed structures. Exempt work still has to meet city codes, and we confirm the rules for your lot before we bid.

Does the City of Kyle enforce my HOA rules?

No. The city says it does not enforce HOA restrictions or requirements, so a project can be approved by the city and still need HOA approval. We review your deed restrictions and HOA rules before we apply for the permit.

What building codes does Kyle use?

The 2021 International codes, including the building, residential, plumbing, mechanical, fuel gas, fire, and energy codes, and the 2020 National Electrical Code.

Do I need to call 811 before digging in Kyle?

Yes, but that alone isn't enough. City of Kyle water, wastewater, and stormwater utilities are not part of Texas 811, so the city's lines need a separate locate request. We request both before any excavation.

Do you do commercial construction and finish-outs in Kyle?

Yes. We build commercial finish-outs and site work in Kyle, and handle the drawings, permit, TDLR accessibility registration when the project needs it, and inspections through certificate of occupancy.

Do you do custom home renovations in Kyle?

Yes. We do whole-home renovations, kitchen and bath remodels, additions, and custom cabinetry in Kyle, and pull the city permit ourselves.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate