StealthGeneral Contracting
Call

Buda, Texas

General contractor in Buda

Custom homes, remodels, commercial projects, and concrete and site work in Buda. We built the City of Buda skate park, so we've worked through Buda's process on a public job as well as private ones.

Concrete bowl and banks at the City of Buda skate park by Stealth General Contracting
City of Buda skate park

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Buda

How permits work in Buda

A one-permit city. Buda puts the mechanical, electrical, and plumbing work on the main building permit: subcontractors are listed on the application instead of pulling their own permits, and each licensed contractor has to be registered with the city.

Platted property only. The city issues building permits only for platted property, and asks applicants to check zoning and historic designation first. Applications are filed through MyGovernmentOnline.

Review time. The city says plan review typically takes about 10 to 15 business days, and it coordinates with the Buda Fire Department on its standards during review.

Historic district and downtown. Properties in the historic district or central business district may also need a Certificate of Design Compliance, even for work that doesn't need a building permit.

What's exempt. Cosmetic work doesn't need a Buda permit: replacing cabinets or flooring, painting, patching interior drywall, and swapping plumbing or light fixtures and appliances as long as the plumbing and wiring aren't altered. Kitchen and bathroom remodels that change plumbing, electrical, or living space do need one, as do new HVAC, EV chargers, solar, and irrigation.

Fences, driveways, and sidewalks. In October 2026 the city council narrowed Buda's permit exemptions: new or relocated fences, driveways, and sidewalks now need a permit, while replacing an existing fence under 7 feet is still exempt.

Inspections and occupancy. Inspections are requested through MyGovernmentOnline with at least 24 hours' notice, and every occupiable building that is built or modified needs a Certificate of Occupancy after final inspections. Commercial and multifamily projects that add buildings or change site utilities, paving, grading, or drainage also need a separate site plan permit.

Source: City of Buda: Building, Construction, Remodel & Additions · City of Buda: Building Codes FAQ · City of Buda: Permits · Hays Free Press: Buda narrows permit exemptions · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Local work

Our work in and around Buda

See all projects →

Services in Buda

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do subcontractors pull their own permits in Buda?

No. Buda is a one-permit city: plumbing, electrical, and mechanical subcontractors are listed on the main building permit application and must be registered with the city.

How long does plan review take in Buda?

The city says about 10 to 15 business days, with more if resubmittals are needed. A complete first submittal is the best way to stay on that timeline.

Do you build in downtown or historic Buda?

Yes. Projects in the historic district or central business district may need a Certificate of Design Compliance, and we plan the design and schedule around it.

Do I need a permit to remodel a kitchen or bathroom in Buda?

Usually, if the work changes plumbing, electrical, mechanical, or living space. Replacing cabinets, counters, flooring, or fixtures in the same spot without altering the plumbing or wiring is cosmetic and doesn't need one. We confirm the scope with the city before we bid.

Does a fence or driveway need a permit in Buda?

Since October 2026, yes for a new or relocated fence, a driveway, or a sidewalk. Replacing an existing fence under 7 feet is still exempt, and fences over 7 feet aren't allowed in residential areas.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate