Pflugerville, Texas
General contractor in Pflugerville
Remodels, additions, custom homes, and commercial projects in Pflugerville and the surrounding Travis County area. We walk the property, send an itemized fixed bid, and manage the city permit, the plan reviews, and the inspections.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Building in Pflugerville
How permits work in Pflugerville
City limits first. Building plans for work inside Pflugerville city limits, including remodels, are submitted to the City of Pflugerville. Properties outside city limits follow a different path, so we confirm the jurisdiction before we price.
One online portal. Pflugerville takes development and permit applications through its online permit portal. Once an application is complete, fees are assessed and paid there.
What a remodel or addition submittal needs. The city's residential remodel and addition checklist asks for a floor plan showing new walls, doors, and windows and any new plumbing, electrical, and mechanical; a demolition plan where applicable; and a framing plan with rafter and joist sizes, the tie-in to existing framing, and insulation. A plot plan with property lines, setbacks, and easements is required for additions but not for interior remodels. Plans in pencil or that are illegible or incomplete are not accepted, and any deficiency extends review. We draw the full set as part of our design-build process.
Cutting the slab means an engineer. Pflugerville requires an engineered foundation plan, stamped, signed, and dated by a Texas registered engineer, for any residential remodel or addition that requires cutting the foundation. That covers moving a drain in a slab for a new shower or tub layout, so we bring the engineer in during design rather than after the permit is rejected. See our bathroom remodel timeline and home addition timeline.
Licensed trades are named on the application. The city's residential addition and remodel application lists the mechanical, electrical, and plumbing subcontractors with their license numbers, along with existing and new square footage. We line up our licensed trade partners before we submit.
Commercial sequence. For commercial work the city's development process runs zoning, platting, a site development permit, then the building permit. Site development needs a zoned and platted lot, with a 15-business-day first review and 10 business days for resubmittals; building permits follow on a 20-business-day review cycle.
What we handle. Drawings, the application, trade coordination, inspections, and the final. On commercial jobs that also means the site work: grading, drainage, paving, curbs, and flatwork.
Source: City of Pflugerville: Current Planning · Residential remodel/addition plan checklist · Residential addition/remodel permit application · Pflugerville Fire: Development Services · Reviewed Nov 2026
Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.
Nearby work
Recent work near Pflugerville

Andy's Frozen Custard, Round Rock
Concrete paving, drive-thru lanes, curbs, sidewalks, and storefront flatwork.
View project →
Supermarket site earthwork
Demolition, mass excavation, fill and compaction, and a finished building pad.
View project →
Avenue N commercial site work
Concrete site walls, retaining wall, drainage, sidewalks, curbs, asphalt paving, and striping.
View project →Services in Pflugerville
Custom Homes in Pflugerville
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →Design-Build in Pflugerville
One contract from first sketch to final walkthrough.
Learn more →Full Home Remodeling in Pflugerville
Whole-home, kitchen, bath, and addition remodels.
Learn more →Commercial Tenant Finish-Out in Pflugerville
Office, retail, restaurant, and medical suites built to lease.
Learn more →Custom Cabinetry in Pflugerville
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →Civil & Site Work in Pflugerville
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Nearby
Also serving
Questions
Common questions
Do you pull permits in Pflugerville?
Yes. We prepare the drawings and the application, submit through the city's portal, and schedule and meet the inspections.
My address says Pflugerville but I'm not sure I'm in city limits. Does it matter?
Yes. Work inside city limits is permitted by the City of Pflugerville; properties outside it follow county or other rules. We confirm the jurisdiction before we bid.
Do you do commercial site work near Pflugerville?
Yes. We've built site concrete, paving, curbs, and drive-thru lanes for Andy's Frozen Custard in Round Rock and earthwork for an Austin supermarket pad, among other civil jobs.
Do I need an engineer to move plumbing in my slab in Pflugerville?
Yes, if the work cuts the foundation. The city requires an engineered foundation plan stamped by a Texas registered engineer for residential remodels and additions that require cutting. We coordinate the engineer as part of design.
What plans does Pflugerville need for a remodel?
A floor plan with new walls, openings, and any new plumbing, electrical, and mechanical; a demolition plan if applicable; and a framing plan. Additions also need a plot plan with property lines, setbacks, and easements. We prepare the full set.
How do I get an estimate?
Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.