Andy's Frozen Custard, Round Rock

Site concrete for a new Andy's Frozen Custard in Round Rock: subgrade preparation, reinforced concrete paving for the parking lot and drive-thru, curbs and islands, sidewalks, and the flatwork around the storefront and covered patio.

Andy's Frozen Custard, Round Rock, Andy's Frozen Custard site concrete in Round Rock
TypeCommercial site concrete and paving
LocationRound Rock, TX
ScopeSubgrade, paving, curbs, sidewalks, flatwork

Phase 01

Subgrade prep

Grading and compacting the subgrade before forming the paving.

Grading the site with a skid steer, Andy's Frozen Custard site concrete in Round Rock
Grading the site with a skid steer
Prepared subgrade across the lot, Andy's Frozen Custard site concrete in Round Rock
Prepared subgrade across the lot
Equipment staged on the finished subgrade, Andy's Frozen Custard site concrete in Round Rock
Equipment staged on the finished subgrade

Phase 02

Reinforcing and pours

Rebar grids on chairs, then ready-mix pours across the parking lot and drive lanes.

Rebar grid set for the paving, Andy's Frozen Custard site concrete in Round Rock
Rebar grid set for the paving
Concrete truck at the paving pour, Andy's Frozen Custard site concrete in Round Rock
Concrete truck at the paving pour
Pouring over the rebar grid, Andy's Frozen Custard site concrete in Round Rock
Pouring over the rebar grid
Rebar and forms along the curb line, Andy's Frozen Custard site concrete in Round Rock
Rebar and forms along the curb line

Phase 03

Concrete paving

Finished, jointed concrete paving for the parking lot and drive-thru.

Finished paving with saw-cut joints, Andy's Frozen Custard site concrete in Round Rock
Finished paving with saw-cut joints
Paving leading to the landscape island, Andy's Frozen Custard site concrete in Round Rock
Paving leading to the landscape island
Paving at sunset after the pour, Andy's Frozen Custard site concrete in Round Rock
Paving at sunset after the pour
Cured paving in front of the building, Andy's Frozen Custard site concrete in Round Rock
Cured paving in front of the building
Paving along the covered patio, Andy's Frozen Custard site concrete in Round Rock
Paving along the covered patio
Parking lot paving complete, Andy's Frozen Custard site concrete in Round Rock
Parking lot paving complete
Full lot of finished paving, Andy's Frozen Custard site concrete in Round Rock
Full lot of finished paving

Phase 04

Curbs, islands, and sidewalks

Curbed landscape islands, sidewalks, and light-pole bases.

Curved curb and sidewalk, Andy's Frozen Custard site concrete in Round Rock
Curved curb and sidewalk
Paving section at the street edge, Andy's Frozen Custard site concrete in Round Rock
Paving section at the street edge
Paving and curb islands, Andy's Frozen Custard site concrete in Round Rock
Paving and curb islands
Forming the next curb island, Andy's Frozen Custard site concrete in Round Rock
Forming the next curb island
Light-pole base with paving behind, Andy's Frozen Custard site concrete in Round Rock
Light-pole base with paving behind
Island forms set for the pour, Andy's Frozen Custard site concrete in Round Rock
Island forms set for the pour

Phase 05

Storefront flatwork

Sidewalks and flatwork at the storefront and under the covered patio.

Curved curb at the storefront planter, Andy's Frozen Custard site concrete in Round Rock
Curved curb at the storefront planter
Flatwork under the covered patio, Andy's Frozen Custard site concrete in Round Rock
Flatwork under the covered patio
Storefront sidewalk ready for finishing, Andy's Frozen Custard site concrete in Round Rock
Storefront sidewalk ready for finishing

Questions

Common questions

Do you pour commercial parking lots and drive-thrus?

Yes. At Andy's Frozen Custard in Round Rock we prepped the subgrade and poured reinforced concrete paving, drive lanes, curbs, and sidewalks.

Do you build curbs and landscape islands?

Yes. We form and pour curbs, curved islands, light-pole bases, and sidewalks with our own crews.

Do you work on restaurant sites?

Yes. We have built site concrete and full restaurant projects, including Wahoo's Fish Tacos in Austin.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate