Wahoo's Fish Tacos, South Shore

A ground-up restaurant and bar on Shore District Drive, built from a cleared lot to opening day: underground utilities, slabs, steel framing, envelope, patio concrete, fencing, and interior finish-out.

Wahoo's Fish Tacos, South Shore, Wahoo's Fish Tacos South Shore build in Austin
TypeGround-up restaurant, bar, and patio
Location1330 Shore District Dr, Austin, TX 78741
ScopeSite work through finish-out

Video

Watch the project on YouTube

Watch on YouTube · More videos on our channel

Phase 01

Site work and underground

Clearing the lot, trenching, and setting underground plumbing before the slab.

Cleared lot before construction, Wahoo's Fish Tacos South Shore build in Austin
Cleared lot before construction
Underground plumbing rough-in in the trenches, Wahoo's Fish Tacos South Shore build in Austin
Underground plumbing rough-in in the trenches

Phase 02

Slabs and flatwork

Foundation and interior slab pours.

Interior space before the slab, Wahoo's Fish Tacos South Shore build in Austin
Interior space before the slab
Wire mesh, vapor barrier, and plumbing stub-ups before the pour, Wahoo's Fish Tacos South Shore build in Austin
Wire mesh, vapor barrier, and plumbing stub-ups before the pour
Fresh interior slab pour, Wahoo's Fish Tacos South Shore build in Austin
Fresh interior slab pour
Crew finishing the interior slab, Wahoo's Fish Tacos South Shore build in Austin
Crew finishing the interior slab
Building slab poured with plumbing and conduit stub-ups protected, Wahoo's Fish Tacos South Shore build in Austin
Building slab poured with plumbing and conduit stub-ups protected
New concrete walk leading to the building, Wahoo's Fish Tacos South Shore build in Austin
New concrete walk leading to the building
Exterior concrete walk poured, Wahoo's Fish Tacos South Shore build in Austin
Exterior concrete walk poured

Phase 03

Structural framing

Light-gauge steel framing for walls and the roof structure.

Steel stud wall panels going up, Wahoo's Fish Tacos South Shore build in Austin
Steel stud wall panels going up
Framed walls with materials staged, Wahoo's Fish Tacos South Shore build in Austin
Framed walls with materials staged
Crew cutting framing lumber on site, Wahoo's Fish Tacos South Shore build in Austin
Crew cutting framing lumber on site
Framing the roof and bar openings, Wahoo's Fish Tacos South Shore build in Austin
Framing the roof and bar openings
Welding a structural steel column, Wahoo's Fish Tacos South Shore build in Austin
Welding a structural steel column
Steel stud walls under the roof deck, Wahoo's Fish Tacos South Shore build in Austin
Steel stud walls under the roof deck
Framed interior along the bar side, Wahoo's Fish Tacos South Shore build in Austin
Framed interior along the bar side
Framed bar opening looking out to the patio, Wahoo's Fish Tacos South Shore build in Austin
Framed bar opening looking out to the patio
Framing at dusk, Wahoo's Fish Tacos South Shore build in Austin
Framing at dusk

Phase 04

Building envelope

Sheathing, weather barrier, roof, and siding.

Building wrapped in weather barrier, seen from the street, Wahoo's Fish Tacos South Shore build in Austin
Building wrapped in weather barrier, seen from the street
Sheathed and wrapped building with bar openings, Wahoo's Fish Tacos South Shore build in Austin
Sheathed and wrapped building with bar openings
Exterior sheathing complete, Wahoo's Fish Tacos South Shore build in Austin
Exterior sheathing complete
Lap siding installed along the side wall, Wahoo's Fish Tacos South Shore build in Austin
Lap siding installed along the side wall
Siding and trim going on, Wahoo's Fish Tacos South Shore build in Austin
Siding and trim going on

Phase 05

Site concrete and fencing

Patio slab, walks, and perimeter fence.

Patio concrete poured beside the building, Wahoo's Fish Tacos South Shore build in Austin
Patio concrete poured beside the building
Finished side walk and patio, Wahoo's Fish Tacos South Shore build in Austin
Finished side walk and patio
Finished patio slab inside the new fence, Wahoo's Fish Tacos South Shore build in Austin
Finished patio slab inside the new fence
Perimeter fence installed, Wahoo's Fish Tacos South Shore build in Austin
Perimeter fence installed

Phase 06

Interior rough-in

Insulation and electrical rough-in inside the steel stud walls before drywall, with licensed partners on electrical and plumbing.

Insulation and electrical rough-in before drywall, Wahoo's Fish Tacos South Shore build in Austin
Insulation and electrical rough-in before drywall

Phase 07

Finished and open

The completed bar, patio, and interior.

Completed bar and patio seating, Wahoo's Fish Tacos South Shore build in Austin
Completed bar and patio seating
Finished bar with seating, back bar, and wall screens, Wahoo's Fish Tacos South Shore build in Austin
Finished bar with seating, back bar, and wall screens
Finished dining room with banquette seating, Wahoo's Fish Tacos South Shore build in Austin
Finished dining room with banquette seating
Finished interior bar, Wahoo's Fish Tacos South Shore build in Austin
Finished interior bar
Finished dining room and storefront windows, Wahoo's Fish Tacos South Shore build in Austin
Finished dining room and storefront windows
Dining room looking toward the bar, Wahoo's Fish Tacos South Shore build in Austin
Dining room looking toward the bar

Phase 08

Restrooms

Finished restrooms with an accessible stall and grab bars, solid-surface vanities, sealed concrete floors, and painted walls with the restaurant's murals.

Accessible toilet stall with grab bar, Wahoo's Fish Tacos South Shore build in Austin
Accessible toilet stall with grab bar
Restroom vanity with a solid-surface top, Wahoo's Fish Tacos South Shore build in Austin
Restroom vanity with a solid-surface top
Restroom corridor with mural door, Wahoo's Fish Tacos South Shore build in Austin
Restroom corridor with mural door
Single restroom sink and mirror, Wahoo's Fish Tacos South Shore build in Austin
Single restroom sink and mirror

Questions

Common questions

Do you build ground-up commercial buildings?

Yes. Wahoo's Fish Tacos South Shore in Austin was built from a cleared lot through underground plumbing, slabs, steel framing, envelope, site concrete, and finish-out.

Can you build restaurants and bars?

Yes. We coordinate bar layouts, plumbing, patio space, and the inspections needed to open.

Do you handle site concrete too?

Yes. Slabs, patios, walks, and flatwork are self-performed by our crews.