StealthGeneral Contracting
Call

Commercial Tenant Finish-Out

Commercial finish-out contractor in Austin: tenant finish-out and tenant improvements

Commercial finish-out and tenant buildout services across Austin and Central Texas. We turn shell and second-generation space into working offices, storefronts, restaurants, clinics, and hospitality spaces, coordinated with landlords and building management.

Commercial Tenant Finish-Out project in the Austin area

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

What's included

Office and retail

Demising walls, ceilings, flooring, millwork, storefront, and lighting.

Restaurants and food service

Kitchen layouts, grease and plumbing coordination, and health-department readiness.

Medical and professional

Exam rooms, ADA restrooms, and accessibility compliance.

Landlord work letters

Pricing and scheduling against the work letter so tenant and landlord costs stay clear.

Same work, different names

Tenant finish-out, tenant improvement, build-out

Whether your broker calls it a tenant finish-out, your lease calls it tenant improvements, or your landlord calls it a commercial build-out, it is the same job: building the inside of a leased space so your business can open in it. As an Austin tenant improvement contractor, we handle the whole package as one general contractor: the walkthrough, an itemized bid, landlord approvals, permits, the build, inspections, and the certificate of occupancy.

By space type

Commercial finish-outs we build in Austin and Central Texas

Office suites. Demising and partition walls, acoustic ceilings, glass fronts, data and power layouts, break rooms, and restrooms. Second-generation offices often reuse ceiling grid and HVAC, which keeps cost and schedule down.

Retail finish-outs and storefronts. In strip centers, mixed-use ground floors, and freestanding pads: storefront glazing, sales-floor finishes, fitting rooms, stockrooms, signage coordination, and lighting, scheduled around the landlord's delivery date and your opening.

Restaurants and bars. Kitchen and bar layouts, grease interceptor and plumbing coordination, hood and fire-suppression interfaces, walk-in coolers, and health-department readiness. Our Wahoo's Fish Tacos South Shore project shows a full restaurant and bar build from site work to opening.

Medical and dental clinics. Exam and procedure rooms, accessible restrooms and routes, plumbing at every room, and finishes that hold up to cleaning.

Hospitality and hotel spaces. Lobby, amenity, and food-and-beverage buildouts where work has to be phased around guests and building operations.

Shell space vs. second-generation space

A cold dark shell starts with little more than a slab, walls, and a roof, so the finish-out includes everything from utilities and HVAC to restrooms. Second-generation space was built out for a previous tenant; some of it can often be reused, but demolition and code upgrades can surprise you. We walk the space before you sign and price both what you see and what is likely behind the walls. See what drives finish-out cost and the tenant finish-out timeline.

Texas requirements

What a Texas tenant finish-out has to clear

Accessibility review (TDLR). Commercial projects with an estimated construction cost of $50,000 or more must be registered with the Texas Department of Licensing and Regulation, and the construction documents go to a Registered Accessibility Specialist for plan review (TDLR). Smaller projects are still required to meet the Texas Accessibility Standards. After construction, a RAS inspection confirms compliance; the owner must request it within 30 days of completion (16 TAC Chapter 68).

City building permit. Austin and surrounding cities review the drawings for building, fire, and energy code before work starts, and some, like Round Rock, ask for the TDLR project number at submittal on projects over $50,000 (City of Round Rock). We build the schedule around review times so opening day is realistic.

Landlord approval. Most leases require the landlord to approve drawings and contractor insurance, and a work letter spells out which costs the landlord covers. We price against the work letter line by line, so tenant and landlord costs stay separate.

Certificate of occupancy. Final building, fire, and health inspections (for food service) come before you can open. We schedule and attend them.

Built by our crews

We self-perform demolition, framing, drywall, ceilings, concrete, and finishes, with licensed partners for electrical, plumbing, and HVAC. See our ground-up Wahoo's Fish Tacos at South Shore and the Avenue N site work, plus our in-progress tenant finish-out at Hill Country Galleria in Bee Cave.

Austin specifics

What's different about a finish-out in Austin

Permitting sets the schedule. City of Austin commercial plan review is thorough, and incomplete submittals go back in line. A complete, coordinated first submittal is the single biggest thing that keeps an opening date on track, so we build the permit timeline into the bid.

Check the use before you sign. A change of use, like office to restaurant or retail to medical, can bring new requirements for restrooms, accessibility, exits, ventilation, grease, and parking. We look at that during the walkthrough, before the lease is final.

Central Texas is not all Austin. Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Kyle, and Buda each run their own permit and inspection process, and timelines differ from the city. We plan around the jurisdiction your suite is in.

Where we build finish-outs

Downtown Austin, The Domain and North Austin, the Arboretum, East Austin, South Congress and South Lamar, Mueller, and Northwest Austin, plus Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Hutto, Kyle, Buda, Bee Cave, and Lakeway.

What to send before the walkthrough

The suite address and intended use, approximate square footage, your target opening date or lease deadline, the LOI or lease and the landlord work letter or TI exhibit, and any drawings, scope notes, or photos you have. We walk the space and send back an itemized, line-by-line bid with one lump-sum total. Read up on TI allowances and shell types first.

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Commercial Tenant Finish-Out across Central Texas

Questions

Common questions

What is a commercial finish-out?

A commercial finish-out is the interior construction that turns a commercial shell or a previous tenant's space into a finished suite for a new business: framing, ceilings, electrical, plumbing, HVAC, restrooms, finishes, and the code items needed for a certificate of occupancy. Office, retail, restaurant, and medical finish-outs are the most common types.

What does a retail finish-out include?

A retail finish-out typically covers storefront glazing and entry doors, the sales floor (walls, ceilings, lighting, flooring), fitting rooms, a stockroom, an accessible restroom, signage coordination with the landlord, and the electrical and HVAC to support displays and point of sale. Strip-center and second-generation retail suites can often reuse some existing systems.

What is a tenant finish-out?

A tenant finish-out, or build-out, is the interior construction that turns leased commercial space into a usable suite: walls, ceilings, MEP, finishes, and code items.

Is a tenant finish-out the same as a tenant improvement or build-out?

Yes. Tenant finish-out, tenant improvement (TI), tenant buildout, and commercial finish out all describe the same work. Texas landlords and brokers tend to say finish-out; leases often say tenant improvements.

Do you provide commercial tenant buildout services in Austin and Central Texas?

Yes. We build finish-outs in Austin, including Downtown, The Domain, the Arboretum, East Austin, and South Congress, and across Central Texas in Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Hutto, Kyle, Buda, Bee Cave, and Lakeway.

What is a TI allowance?

A tenant improvement allowance is the landlord's contribution toward the finish-out, usually written into the lease per square foot. It is not the same as the construction cost; the tenant typically covers anything above it. See our TI allowance guide.

What should I bring to a finish-out walkthrough?

The suite address, intended use, approximate square footage, your target opening date, and anything you have from the landlord: the lease or LOI, the work letter or TI exhibit, and any drawings or photos.

Do you handle change-of-use projects?

Yes, and it is worth checking before you sign. Changing a space's use, such as office to restaurant or retail to medical, can trigger new code requirements for restrooms, accessibility, exits, ventilation, and parking. We review that during the walkthrough.

Do you handle commercial permits?

Yes. We coordinate drawings, submit to the city, and manage inspections through certificate of occupancy.

Can you work after hours?

Yes. In occupied buildings we schedule noisy work around tenants and building rules.

Do you build out restaurants, medical, hotel, and hospitality spaces?

Yes. We build office, retail, restaurant and bar, medical and dental, and hospitality and hotel tenant buildouts, with licensed partners for electrical, plumbing, and HVAC.

Should I tour the space with a contractor before signing the lease?

Yes. A walk-through before signing tells you what the existing space can reuse, what code upgrades are likely, and how much to negotiate in the landlord work letter.

Does my finish-out need TDLR accessibility review?

If the estimated construction cost is $50,000 or more, the project must be registered with TDLR and reviewed by a Registered Accessibility Specialist. Smaller projects still have to meet the Texas Accessibility Standards.

How long does a tenant finish-out take?

We walk the space first, then send an itemized bid with a schedule built for that suite: drawings and permit review, landlord approvals, demolition, rough-ins, finishes, and the inspections through certificate of occupancy. You see the opening date the plan supports before work starts.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate