StealthGeneral Contracting
Call

Design-Build

Design-build contractor in Austin and Central Texas, under one contract

Instead of hiring a designer, then shopping drawings to builders, you get one team that designs to your budget and builds what it drew, in Austin, Round Rock, Cedar Park, Georgetown, Lakeway, and the rest of Central Texas.

Design-Build project in the Austin area

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

What's included

Budget-first design

We price as we draw, so the plans match what you want to spend before permits are filed.

Drawings and engineering

Floor plans, elevations, and coordination with structural engineers when the scope needs stamped drawings.

Permits handled

We assemble and submit permit packages and manage inspections.

Additions and new builds

Room additions, second stories, ADUs, and ground-up homes on infill lots.

How design-build works

Design-build in Austin, step by step

1. Site visit and budget. We walk the property, measure, and talk through what you want to build and what you want to spend. On infill lots we check zoning, setbacks, and impervious cover early, because they set the size of the project before design starts.

2. Concept design priced as it is drawn. Floor plans and elevations are developed alongside a running cost estimate, so you choose between options with real numbers instead of finding out after the drawings are done.

3. Engineering and permit set. We coordinate structural engineering and any other stamped drawings the scope needs, then assemble and submit the permit package to the city.

4. Fixed, itemized proposal. Once the design is set you get an itemized proposal with one lump-sum total, so you know what is included before construction starts.

5. Construction by the same team. The people who designed the project build it, so questions in the field get answered fast and the finished building matches the plans.

What we design and build

Room additions and second stories, ADUs and backyard cottages, ground-up homes and small multi-unit projects on infill lots, and commercial buildings. See our Vargas Street house and ADU in Austin, built and then set up as a two-unit condo regime, and compare delivery methods in design-build vs. design-bid-build.

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Design-Build across Central Texas

Questions

Common questions

What is design-build?

Design-build means one company handles both design and construction under a single contract, which reduces redesign, change orders, and finger-pointing.

Is design-build more expensive?

Usually not. Pricing during design avoids drawing something that later has to be value-engineered, which saves time and fees.

Do you work with my architect?

Yes. We can build from an architect's drawings or bring the design in-house.

Do you design and build ADUs and additions in Austin?

Yes. We design and build room additions, second stories, ADUs, and new homes on infill lots, and handle the engineering coordination and permits.

Do you build build-to-rent and small multifamily projects?

Yes. We design and build duplexes, condos, and small multi-unit projects for owners and investors, like our Vargas Street house and ADU in Austin, built from demolition to finish and then set up as a two-unit condo regime.

Are you a Central Texas design-build contractor?

Yes. We design and build across Central Texas, including Austin, Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Hutto, Lakeway, Bee Cave, Dripping Springs, Kyle, and Buda.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate