StealthGeneral Contracting
Call

Round Rock, Texas

General contractor in Round Rock

Remodels, additions, custom homes, and commercial work in Round Rock. We built the site concrete, paving, and drive-thru for Andy's Frozen Custard here, and we handle Round Rock's one-permit process for the whole team.

New concrete paving at Andy's Frozen Custard in Round Rock by Stealth General Contracting
Andy's Frozen Custard, Round Rock

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Round Rock

Residential and commercial general contractor in Round Rock: how permits work

One permit covers the whole job. Round Rock uses a one-permit system: the electrical, plumbing, and mechanical work for a remodel goes on the same building permit, and every contractor on the job has to be listed and registered with the city before the permit is issued (City of Round Rock Building Inspection). We assemble the full team and the application together so the permit isn't held up waiting on a sub.

What needs a permit. The city requires a permit for construction, alteration, demolition, or replacement of electrical, gas, mechanical, or plumbing systems, and for changing a building's occupancy. Even small accessory structures, like a shed under 200 square feet, need one, and they must stay in side or rear yards, out of setbacks and easements, and under 15 feet tall.

Commercial finish-outs. Tenant finish-outs and commercial remodels follow the commercial building code, and a certificate of occupancy is issued when a space is remodeled or renovated. Projects of $50,000 or more also need a TDLR accessibility registration number at submittal. Read what drives finish-out cost before you sign a lease.

Start on time. A Round Rock permit expires if work doesn't begin within six months, so we schedule the start before we pull it.

Local work

Our work in and around Round Rock

See all projects →

Services in Round Rock

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do I need a permit to remodel in Round Rock?

If the work alters the structure or replaces electrical, gas, mechanical, or plumbing systems, yes. Round Rock puts all of that trade work on one building permit, which we prepare and submit.

Do subcontractors have to register in Round Rock?

Yes. Every contractor and subcontractor on a building permit must be registered with the city, and all of them must be listed on the application before the permit is issued.

Are you a commercial general contractor in Round Rock?

Yes. We build commercial site work, tenant finish-outs, and restaurant and retail spaces in Round Rock, including the drive-thru, concrete, and paving at Andy's Frozen Custard. We handle the commercial permit, registered trade partners, and inspections through certificate of occupancy.

Do you do commercial tenant finish-outs in Round Rock?

Yes. We handle the commercial permit, TDLR accessibility registration for projects of $50,000 or more, landlord coordination, and inspections through certificate of occupancy.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate