Project · Round Rock, TX
Commercial utilities and site work, Round Rock
Underground utilities and site work for a commercial project in Round Rock. Our crews graded the site and built the building pad, trenched and installed the sanitary sewer main and manhole, laid the water line with restrained fittings, then set rebar and poured the concrete paving.

Phase 01
Site grading and building pad
The site was cut and filled with a dozer, base was stockpiled and spread, and the building pad was brought to grade with the CMU walls going up beside it.







Phase 02
Sanitary sewer and manhole
The sewer main was laid on bedding in an open trench and tied into a precast manhole, with a cleanout stubbed up at the building.



Phase 03
Water line
The water line was laid in the trench with restrained ductile fittings at the bends and tees, then marked for backfill.






Phase 04
Rebar and concrete paving
Rebar grids were tied on chairs across the paving areas, then the concrete was placed and finished, including a night pour.





Questions
Common questions
Do you install commercial water and sewer lines?
Yes. On this Round Rock job our crews trenched and installed the sanitary sewer main, set the manhole, and laid the water line with restrained fittings.
Do you do the grading and paving too?
Yes. We self-perform site grading, building pads, rebar, and concrete paving, so the utilities and site work are built by one team.
How do you price utility and site work?
Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.