StealthGeneral Contracting
Call

Full Home Remodeling · Whole-Home Renovation

Whole-home renovation in Austin, TX

When every room needs work, one plan beats a string of separate remodels. We take homes back to the structure where needed and rebuild layout, systems, kitchens, baths, and the exterior on one schedule with our own crews.

Hillside Austin home during a whole-home renovation

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Whole-Home Renovation services

Gut renovations

Interior demolition to studs, then new insulation, drywall, trim, floors, and finishes throughout.

Layout changes

Opening walls, moving kitchens and baths, and reworking circulation, with engineered beams where walls carry load.

New electrical, plumbing, and HVAC

Panel upgrades, rewiring, new supply and drain lines, and new ductwork by licensed partners.

Windows, doors, and exterior

New windows and doors, siding, stucco, and roofing so the shell matches the new interior.

Kitchens and baths

Every kitchen and bath in the house rebuilt with our custom cabinets and tile crews.

Structural repair

Foundation, framing, and rot repair found during demolition, handled by the same team.

Planning a whole-home renovation

Why one plan for the whole house

Systems run through every room. Plumbing, wiring, and ductwork don’t stop at a room’s walls. Renovating the whole house at once lets us replace them once, instead of patching around old systems room by room.

One schedule, one crew. Our crews handle demolition, framing, drywall, trim, tile, and most finishes, so phases hand off without waiting on new subs. Licensed electrical, plumbing, and HVAC partners work on the same schedule.

Older homes hide things. Original wiring, cast-iron drains, undersized framing, and foundation movement are common in Austin homes. We plan for what a gut usually exposes and tell you up front how we will handle it.

Permits. A whole-home renovation needs a residential building permit and trade permits in Austin (City of Austin: residential building permits). We prepare the package and attend every inspection.

Our work

Related projects and guides

All projects →

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Whole-Home Renovation across Central Texas

Questions

Common questions

How much does a whole-home renovation cost in Austin?

It depends on how much of the structure and systems are replaced and on finishes. We don’t publish ranges. We walk every room and send an itemized fixed bid with one lump-sum total.

How long does a whole-home renovation take?

Months rather than weeks, depending on size and how much is rebuilt. You get a schedule with the bid, after we have seen the house.

Can we live in the house during a whole-home renovation?

Sometimes, in phases. For a full gut, most owners move out for the main demolition and rough-in. We plan it with you before work starts.

Do you handle design and permits?

Yes. We work from your architect’s drawings or design the layout with you, coordinate engineering, and pull the permits.

Do you replace the electrical and plumbing?

Yes, through licensed electrical and plumbing partners who work on our schedule.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate