Project · El Viejo Camino, Austin
Old barn remodel, in progress
An active remodel: we took an old barn down to the studs and are replacing every mechanical, electrical, and plumbing system, adding structural support, and rebuilding the exterior with new sheathing, siding, and a metal roof. Drywall is up inside and finishing is underway. We'll add photos as work continues.

Video
Watch the project on YouTube
Phase 01
Complete gut
Interior stripped to the framing and the old electrical service removed.

Phase 02
Structural support
New posts, beams, and framing to bring the old structure up to current loads.


Phase 03
New envelope
Sheathing, house wrap, and new openings.



Phase 04
Siding and metal roof
New board-and-batten siding, trim, and a standing-seam metal roof, with new windows and an awning over the side entry.



Phase 05
Insulation and ceilings
Spray foam insulation in the walls, then drywall hung on the vaulted ceilings.



Phase 06
Drywall and finishing (underway)
Drywall is hung throughout the open interior, and the crew is taping, mudding, and finishing the walls and ceilings now.


Phase 07
On the jobsite
Stealth Civil General Contracting on site during the remodel.


Questions
Common questions
Can you remodel an old barn into usable space?
Yes. On El Viejo Camino we gutted an old barn to the studs and are adding structural support and replacing all mechanical, electrical, and plumbing systems.
Do you replace electrical, plumbing, and HVAC in a gut remodel?
Yes. We manage all MEP replacement, with licensed electrical, plumbing, and HVAC partners doing the licensed work.
Can you add structural support to an older building?
Yes. We add posts, beams, and framing, with engineering when the scope needs it.