StealthGeneral Contracting
Call

Dripping Springs, Texas

General contractor in Dripping Springs

Custom homes, barn and ranch-house remodels, custom cabinetry, and site work in Dripping Springs and western Hays County. Larger lots, limestone, long driveways, and dark-sky lighting rules all shape these projects, and we plan for them from the onsite walk.

Primary bath with black double vanities, wood ceiling, and freestanding tub by Stealth General Contracting
Primary bath vanities, one of our custom cabinetry projects

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Dripping Springs

What to know before you build or remodel in Dripping Springs

Third-party plan review and inspections. The City of Dripping Springs contracts with a third-party agency for structural plan review and most building inspections on both residential and commercial projects, alongside an in-house residential inspector. We schedule each inspection with the right party.

Every trade registers. Building permits are filed through MyGovernmentOnline. Licensed trades register with the city and apply for their own permits under the main building permit, and inspections aren't released until every subcontractor is registered.

Dark-sky lighting. Dripping Springs has had an outdoor lighting ordinance since 2000 and is an International Dark Sky Community. Outdoor fixtures must be shielded so the light source isn't visible from other properties, and total outdoor light on residential property is capped per acre.

City or county. Many Dripping Springs addresses are outside city limits. We confirm the jurisdiction before we price, because it changes who reviews the plans and inspects the work.

Plan review timing inside the city. The city's development manual says residential permits get two reviews, building code and planning and zoning, with up to 12 business days for first comments and 5 to 8 more after a resubmittal. Commercial permits can get up to five reviews, including fire, exterior design, and exterior lighting, with up to 30 business days for the first round.

Septic comes first. If the property is on septic, the city won't issue the building permit until the city sanitarian approves the septic permit. In unincorporated Hays County, every septic system needs a county permit, and each system is sized by bedrooms or square footage, so adding bedrooms can mean upgrading the system.

County development permits in the ETJ. Outside city limits, Hays County requires a development permit for houses, pools, sheds, outbuildings, grading, and fill. Renovating the inside of a house outside the floodplain doesn't need one, but additions and new square footage may. The county permit is good for one year to start and two years to finish.

Commercial work outside the city. In unincorporated Hays County, the Hays County Fire Marshal's Office permits commercial, public, and multifamily buildings under the 2018 International Fire Code, inspects through construction, and issues a Certificate of Compliance at the end. Plans needed within 10 business days, or projects of 10,000 square feet or more, go to an approved third-party reviewer.

Site work and drainage. Adding impervious cover to a nonresidential lot takes a site development permit first. For site development and construction plans in the city or ETJ, an engineer has to show that stormwater leaving the site after construction is no more than before.

Source: City of Dripping Springs: Inspection Information · Outdoor Lighting · Dripping Springs Development Manual · Hays County: Development Permits FAQ · Hays County: Development Services FAQs · Hays County: Septic Permits · Hays County Fire Marshal: Prevention & Compliance · Hays County Fire Marshal fee schedule (3rd-party review rules) · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Dripping Springs

See all projects →

Services in Dripping Springs

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Who inspects construction in Dripping Springs?

For property under the city's building code, a third-party agency handles structural plan review and most inspections, and the city also has an in-house residential inspector. We schedule with whichever applies.

Do my outdoor lights have to be dark-sky compliant?

Inside the city's jurisdiction, yes. Fixtures must be shielded so the light source isn't visible from other properties, and total output is limited. We specify compliant fixtures.

Do you remodel barns and older ranch houses?

Yes. Our El Viejo Camino barn remodel is a complete gut with all-new MEPs, added structural support, and a new envelope, siding, and metal roof.

How long does a residential permit take in Dripping Springs?

Inside city limits, the city's development manual allows up to 12 business days for the first round of plan review comments, 5 to 8 business days for a second review after resubmittal, and about 3 business days to issue an approved permit. Septic approval has to come first on septic lots.

Do I need a permit to remodel a house outside Dripping Springs city limits?

Hays County does not require a development permit to renovate the interior of a single-family house outside the floodplain. Additions, new square footage, pools, outbuildings, and grading generally need a county development permit, and the septic system may need an upgrade.

Can I add a bedroom if I'm on septic in Hays County?

Maybe. Every septic system is designed and permitted for a set number of bedrooms or square footage. Adding bedrooms usually means the county reviews the existing system, and it may need to be modified under a new permit before the addition.

Who permits commercial buildings near Dripping Springs?

Inside the city, commercial permits go through the City of Dripping Springs, with fire, exterior design, and exterior lighting reviews. In unincorporated Hays County, the Hays County Fire Marshal's Office permits and inspects commercial buildings and issues a Certificate of Compliance.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate