StealthGeneral Contracting
Call

West Lake Hills, Texas

General contractor in West Lake Hills

Luxury remodels, whole-home renovations, steam showers, custom cabinetry, and custom homes in West Lake Hills (78746). West Lake Hills is its own city with its own permit office, impervious cover limits, and contractor registration, and many lots are steep, wooded, and on septic, so we start every project with an onsite walk.

Finished steam shower with a floor-to-ceiling glass enclosure next to a tub by Stealth General Contracting
A glass steam shower, one of our bathroom remodels in the Austin area

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in West Lake Hills

How permits work in West Lake Hills

The city reviews it, not Austin. Projects inside West Lake Hills city limits are permitted by the City of West Lake Hills. All applications and resubmittals go through its online MGO Connect portal, and applications that need plan review are accepted on the first business day of the week.

Plan on review rounds. Once an application is administratively complete, the city says the first round of comments can take up to four weeks. Each round needs a comment response letter, and the cycle repeats until every comment is addressed. Larger projects such as new construction or reconstruction can take a few months or longer to permit.

Contractor registration. Any contractor working on a project valued at $25,000 or more must register with Building and Development Services before the permit is issued, with general liability insurance of at least $600,000. Plumbing, electrical, and mechanical work needs licensed, registered contractors except for narrow homeowner exceptions.

What a new home or addition submittal needs. The residential application calls for a tree and topo survey, a property survey with platted and zoning setbacks, a project drainage report, building elevations with height measured from natural grade, an energy code check, an HVAC load calculation, an outdoor lighting plan where applicable, and septic locations if the lot is on septic.

Other agencies sign off too. Depending on the property, the application may need approval letters from agencies such as Travis County, TCEQ, ESD #9, WCID #10, TxDOT, or the City of Austin. The city recommends applying to outside agencies first.

Impervious cover. Single-family lots of half an acre or more are limited to 25% impervious cover. Smaller lots use a formula, and getting above 25% requires a connection to the city's wastewater service. Driveways, patios, and pool decks all count.

Setbacks and height. In the R-1 district, lots of half an acre or more have a 50-foot front setback and a 30-foot maximum building height, so many additions are planned around setbacks before design starts.

Pools and interiors. A pool needs its own permit even when it is part of a remodel or addition. Interior remodels and finish-outs don't need a pre-application meeting, while larger projects may.

Source: City of West Lake Hills: Building & Development · Building & Development FAQs · Contractor registration · Residential permit application · Dimensional regulations · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near West Lake Hills

See all projects →

Services in West Lake Hills

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do I need a permit to remodel in West Lake Hills?

Yes, for remodels, additions, and new construction inside city limits. Applications go through the city's MGO Connect portal. Small projects like roofing, HVAC, or water heaters use the city's small project application.

How long does a West Lake Hills permit take?

The city says first comments can take up to four weeks after an application is complete, and each round of comments repeats until everything is resolved. New homes and reconstructions can take a few months or longer.

Do contractors have to register in West Lake Hills?

Yes, on projects valued at $25,000 or more, with at least $600,000 in general liability insurance. We register and coordinate our licensed trade partners.

How much impervious cover can I have in West Lake Hills?

25% on single-family lots of half an acre or more. Smaller lots use a formula, and going above 25% requires a connection to city wastewater.

Do you build steam showers in West Lake Hills?

Yes. We build steam showers as part of bathroom remodels, with vapor-proof waterproofing, glass to the ceiling, and licensed electrical and plumbing for the generator.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate