StealthGeneral Contracting
Call

Commercial Tenant Finish-Out · Restaurant Buildouts

Restaurant construction and buildout contractor in Austin, TX

Restaurant and bar buildouts, from second-generation kitchens to ground-up buildings. We built Wahoo’s Fish Tacos at South Shore from a cleared lot to opening day, and we build every restaurant to the health inspection and the opening date.

Finished Wahoo's Fish Tacos restaurant and bar at South Shore in Austin

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Restaurant Buildouts services

Commercial kitchens

Kitchen layouts, equipment rough-ins, floor drains, and washable finishes built to the equipment schedule.

Hoods and fire suppression

Hood framing and supports, roof curbs, and coordination with the hood and suppression installers.

Grease interceptors and plumbing

Interceptor excavation and setting, sanitary and grease lines, and hand sinks, by licensed plumbers.

Bars and dining rooms

Bar dies and tops, booths, millwork, lighting, and finishes for the front of house.

Walk-in coolers and freezers

Slabs, recesses, power, and drains ready for walk-in boxes.

Patios and site work

Patio slabs, fencing, ADA routes, and site concrete, built by our own crews.

Planning a restaurant buildout

What an Austin restaurant has to clear

Health department plan review. In Austin and Travis County, new construction and remodels of food establishments go through Austin Public Health plan review, then a pre-opening inspection before the operating permit is issued (Austin Public Health: fixed food establishments). We build to the approved plans and schedule the inspection.

Building, fire, and accessibility. The city reviews the building, fire, and energy code. Commercial projects of $50,000 or more are registered with TDLR for accessibility review and inspection (TDLR: architectural barriers at a glance).

Second-generation vs. shell. Taking over an existing restaurant can save the hood, interceptor, and walk-in, but only if they meet current code and fit your menu. We walk the space before you sign and tell you what can stay.

Opening date. Rent usually starts before the first customer. We sequence long-lead equipment, inspections, and finishes around your opening date.

Our work

Related projects and guides

All projects →

Google reviews

What clients say

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”

Carly PeralesGuest house

“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”

Ashley Gilbert

“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”

Christian Mattson

“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”

McCaleb LanierRemodel
Worked with us? Leave a review

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Service area

Restaurant Buildouts across Central Texas

Questions

Common questions

How much does a restaurant buildout cost in Austin?

The kitchen equipment, hood, interceptor, and how much of a previous restaurant can be reused drive it. We don’t publish ranges. We walk the space and send an itemized fixed bid.

Do I need health department approval before building?

Yes. In Austin and Travis County, Austin Public Health reviews plans for new and remodeled food establishments, then does a pre-opening inspection before issuing the operating permit.

Can you reuse the existing hood and grease trap?

Sometimes. If they meet current code and suit your menu and volume, reusing them saves time. We check before you sign the lease.

Have you built a restaurant before?

Yes. We built Wahoo’s Fish Tacos at South Shore in Austin, a ground-up restaurant and bar, from site work to opening.

Can you work from my landlord’s work letter?

Yes. We price the landlord’s work and your tenant work as separate lines.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate