Full Home Remodeling · Kitchen Remodeling
Kitchen remodeling in Austin, TX
From a cabinet-and-countertop update to a full gut with a new layout, we remodel kitchens across Austin with our own crews and our own custom cabinetry, plus licensed electrical and plumbing partners on the same schedule.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Kitchen Remodeling services
Full kitchen remodels
Demolition to finished room: layout, cabinets, tops, backsplash, flooring, lighting, and appliances installed.
Layout changes and open kitchens
Moving the sink or range, adding an island, or taking out a wall with an engineered beam to open the kitchen to the living room.
Custom kitchen cabinets
Cabinets built to the room by our own shop: walnut, flat-panel modern, painted shaker, and two-tone. See our custom cabinetry page.
Countertops and backsplash
Quartz, granite, and marble tops with undermount sinks, coordinated with tile backsplash and outlet layout.
Islands, pantries, and storage
Seated islands with drawer banks, walk-in and cabinet pantries, appliance garages, and tall oven walls.
Lighting, electrical, and plumbing
Recessed and under-cabinet lighting, new circuits for appliances, gas lines, and relocated plumbing, by licensed partners.
Planning a kitchen remodel
What decides the scope of an Austin kitchen remodel
Keep the layout or change it. Leaving the sink, range, and refrigerator where they are keeps plumbing, gas, and venting in place. Moving them, adding an island sink, or removing a wall adds trade work, and sometimes a beam and an engineer’s letter. We tell you which is which at the onsite walk.
Cabinets drive the schedule. Custom cabinets are the longest lead item in most kitchens. Because we build our own, we can lay out every run to your walls and set the install date ourselves. See the kitchens and vanities we’ve built.
Permits. The City of Austin requires a building permit to alter or improve a building, and some kitchen remodels qualify for a faster express permit when the scope stays small (City of Austin: express permits). Moving walls or adding circuits and plumbing usually means a full permit with trade permits. We prepare it and meet the inspectors.
Living through it. Most families stay in the house during a kitchen remodel. We set up a temporary kitchen area, keep dust walls up, and sequence the work so water and power are off as little as possible. Our kitchen remodel timeline walks through each phase.
Our work
Related projects and guides
Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Kitchen Remodeling across Central Texas
Questions
Common questions
How much does a kitchen remodel cost in Austin?
It depends on whether the layout changes, the cabinets and tops you choose, and what is behind the walls. We don’t publish price ranges. We walk the kitchen, then send an itemized fixed bid with every line listed and one lump-sum total.
How long does a kitchen remodel take?
Plan on a few weeks of construction for a cabinet-and-top update, and longer when walls, plumbing, or electrical move. Permit review and cabinet lead time come first. See our kitchen remodel timeline for the phases.
Do I need a permit to remodel my kitchen in Austin?
Usually, yes. The City of Austin requires a permit to alter a building, with a faster express permit for some smaller kitchen scopes. Moving walls, plumbing, or adding circuits needs a full permit. We handle it.
Do you build the cabinets yourselves?
Yes. Custom cabinetry is one of our services, so the same company lays out, builds, and installs your cabinets.
Can you remove a wall to open up my kitchen?
Often, yes. If the wall is load-bearing we have an engineer size a beam and we install it with temporary shoring. We confirm what is in the wall at the onsite walk.


