Full Home Remodeling · Bathroom Remodeling
Bathroom remodeling in Austin, TX
Primary bath rebuilds, walk-in showers, tub-to-shower conversions, and hall baths, built by our own tile and finish crews with licensed plumbing and electrical partners, and waterproofed before a single tile goes on.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Bathroom Remodeling services
Full bathroom remodels
Down to the studs and subfloor: new layout, plumbing, waterproofing, tile, vanity, lighting, and ventilation.
Walk-in showers
Curbless and low-curb showers, linear drains, niches, benches, and frameless glass.
Tub-to-shower conversions
Removing an unused tub for a larger shower, with the drain, valve, and waterproofing rebuilt to suit.
Custom tile installation
Floors, shower walls, and feature walls in porcelain, stone, and large-format tile, set by our own crew.
Vanities and storage
Custom vanities and linen towers from our cabinet shop, with stone tops and undermount sinks.
Accessible and aging-in-place baths
Wider doorways, grab-bar blocking, no-step entries, and comfort-height fixtures.
Planning a bathroom remodel
What we check before we bid a bathroom
The subfloor and the drain. Many older Austin homes have cast-iron drains or soft subfloor around the tub. We look for both at the onsite walk, because they change the scope more than the tile does.
Waterproofing. Every shower we build gets a continuous waterproofing system behind the tile, pan to ceiling, flood-tested before tile. It is the part you never see and the part that decides whether the shower lasts. Planning steam? See our steam shower installation page.
Ventilation and electrical. A properly sized exhaust fan vented outside, GFCI protection, and lighting at the mirror and in the shower, installed by licensed partners.
Permits. The City of Austin offers an express permit for some small bathroom remodels like tub and shower conversions; larger scopes need a full building permit with trade permits (City of Austin: express permits). We pull it and schedule the inspections. See our bathroom remodel timeline for the phases.
Our work
Related projects and guides

Steam wet room remodel
A glass-enclosed steam wet room with a freestanding tub, porcelain slab walls, and a hex mosaic floor.
See the project →
Marble-look steam shower
Black-and-white porcelain floor to ceiling, a glass steam enclosure, and a tile-wrapped tub deck.
See the project →
Steam shower
Floor-to-ceiling glass, tiled walls and ceiling, twin rain heads, and linear drains.
See the project →
Vanities and linen towers
Bath cabinetry built in our shop, including a linen tower set flush into stone.
See the baths →
Wesson Residence baths
Seven and a half baths in a whole-home renovation, in progress.
See the project →
Bathroom remodel timeline
Every phase of a bath remodel, step by step.
Read the guide →Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Bathroom Remodeling across Central Texas
Questions
Common questions
How much does a bathroom remodel cost in Austin?
The layout, the shower, the tile, and what we find under the floor all move the number. We don’t publish price ranges. We walk the bathroom and send an itemized fixed bid with one lump-sum total.
How long does a bathroom remodel take?
A straightforward bath takes a few weeks of construction once materials are on site; moving plumbing or walls adds time. Our bathroom remodel timeline lays out each step.
Do I need a permit for a bathroom remodel in Austin?
Usually. Some small tub and shower conversions fit Austin’s express permit, and anything that moves plumbing, walls, or circuits needs a full permit. We handle the permit and inspections.
Can you convert my tub to a walk-in shower?
Yes. We remove the tub, rework the drain and valve, waterproof the new shower, and tile it, with glass to finish.
Do you build accessible bathrooms?
Yes: wider doors, no-step showers, grab-bar blocking, and comfort-height fixtures, planned around who will use the room.