Project · Austin area
Steam shower with floor-to-ceiling glass
A completed walk-in steam shower in a modern primary bath. The enclosure runs from the floor to the ceiling in frameless glass so it can hold steam, with large-format porcelain on the walls and ceiling, a small-format mosaic floor, twin rain heads set into the ceiling, wall heads and body sprays, recessed niches, LED light bars, and linear drains along the back wall. The freestanding tub sits just outside the glass beside the courtyard window.

Phase 01
Ceiling rough-in
Before tile, the shower ceiling was sheathed in cement backer board with the twin rain-head housings and recessed light cans set in place. The ceiling is built as part of the wet area so it can hold steam.

Phase 02
Finished steam shower
A sealed, floor-to-ceiling glass enclosure with tiled walls and ceiling. Two ceiling-mounted rain heads, two wall heads, body sprays, and digital controls sit inside, with recessed niches, vertical LED light bars, and twin linear drains at the base of the wall.


Questions
Common questions
Do you build steam showers?
Yes. This walk-in steam shower was built with a floor-to-ceiling glass enclosure, tiled walls and ceiling, and steam and shower fixtures, with licensed plumbing and electrical trades on the systems that require them.
Why does a steam shower need glass to the ceiling?
Steam rises and escapes through any gap at the top. Running the glass and tile all the way to the ceiling keeps the steam inside the shower and out of the rest of the bathroom.
How do you price a steam shower or bathroom remodel?
Every project is walked onsite, then bid with an itemized fixed bid and one lump-sum total.