StealthGeneral Contracting
Call

Leander, Texas

General contractor in Leander

Custom homes, remodels, custom cabinetry, and commercial work in Leander, from established neighborhoods to new lots along the US 183 corridor. We walk the site, send an itemized fixed bid, and run the Leander permit from application to final inspection.

White shaker kitchen with a raised breakfast bar and island seating by Stealth General Contracting
White shaker kitchen, one of our custom cabinetry projects

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Leander

How permits work in Leander

Everything is filed online. Leander processes building permit applications through its online Development Hub, which is also where permit status is tracked and inspections are requested. Applications expire 180 days after filing unless submittals are actively in progress.

What needs a permit. A permit is required before construction inside city limits. That includes new buildings, additions, remodels that move or remove interior walls or change electrical, mechanical, or plumbing, accessory buildings, pools, driveways, demolition, solar, water heaters, generators, and fences over seven feet. Painting, re-roofing, siding and window replacement, cabinets, flooring, drywall repair, and like-for-like fixture swaps do not. In the Leander ETJ, permits are generally limited to signs, driveways connecting to city-maintained roads, and water and wastewater connections.

Which codes apply. Leander has adopted the 2021 ICC code package and the 2023 electrical code with local amendments, and its 2021 Fire Code and amendments took effect July 1, 2025.

Contractors register first. Every general contractor and subcontractor needs an updated registration form on file with the city before the permit is issued, and plumbing, electrical, and mechanical contractors must be licensed by the State of Texas. We register our crew and trade partners and list them on the application.

What a new home submittal needs. The city's checklist calls for a plot plan with setbacks and easements, a landscape plan, stamped engineered foundation and wind-bracing plans, an energy compliance report, and Manual J, S, and D load calculations. Homes over 6,000 square feet, or lots with a long steep drive, also need a topographic map.

Septic lots. For remodels and additions on a septic system, Leander asks for an approved OSSF form or a letter from the county showing the existing system is sized for the added use. We confirm that before the design is final.

Review timelines. The city posts first-review targets of 10 business days for a new single-family home, an addition, or a residential remodel, with 5-day re-reviews. Commercial remodels and tenant finish-outs are 10 business days, new commercial buildings 15, and certificates of occupancy 3.

Inspections. Requests made before 4 p.m. are typically inspected the next business day. Fire finals are scheduled separately with the Fire Marshal's office.

Commercial sites. Leander requires a site development permit for all development except single-family houses on individually platted lots. Projects adding under 1,000 square feet of impervious cover can use a minor site development application, and interior finish-outs that don't increase the footprint or change parking requirements are exempt. When site work is required, the city issues a Certificate of Completion for it before the building's certificate of occupancy.

Opening a business. A certificate of occupancy is needed when a building's use or its owner or occupant changes. Leander requires a pre-application meeting with building, fire, and planning staff before the application, and both a building and a fire inspector visit before the certificate is issued. See our commercial finish-out work.

Trees. Owners of a completed, occupied home can remove a tree without a permit, though a front-yard tree may need to be replaced to meet landscape requirements. On development projects, removing a heritage tree over 26 caliper inches requires Planning and Zoning Commission and City Council approval.

Source: City of Leander: Permits & Building Inspection · Development Process and review timelines · Development Guide · Residential application requirements · Site Development · Certificate of occupancy submittal packet · Fire Inspection & Compliance · Landscaping FAQ · Tree removal request packet · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Leander

See all projects →

Services in Leander

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do I need a permit to remodel in Leander?

If the remodel relocates or removes interior walls or changes electrical, mechanical, or plumbing, yes. Re-roofing, siding, window replacement, paint, cabinets, and flooring generally don't need one. We confirm with the city before we bid.

Do contractors have to register in Leander?

Yes. All contractors and subcontractors must be registered with the City of Leander before the permit is issued. We handle it for our crew and trade partners.

How long does Leander take to review a building permit?

The city's posted target is 10 business days for the first review of a new home, addition, or residential remodel, and 5 business days for each re-review. Commercial remodels and tenant finish-outs are 10 business days. Complete plans keep a job on that track.

Can I add on to a Leander home that's on septic?

Usually, but the city asks for an approved OSSF form or a county letter showing the existing septic system is sized for the added use before it will permit the remodel or addition. We check this early in design.

What does it take to open a business in a Leander space?

A certificate of occupancy, which starts with a required pre-application meeting with city building, fire, and planning staff. Any finish-out work is permitted separately, and both a building and a fire inspection are required before the certificate is issued.

Do you build commercial projects in Leander?

Yes. We handle the site development permit, concrete and site work, and the building, from finish-outs to ground-up work.

Can I use a VA loan to build with you in Leander?

Yes, if your lender offers VA construction financing and accepts us through its builder review. Since March 31, 2025, the VA no longer requires a builder ID for most new construction loans. Builders sign the VA one-year warranty, Form 26-1859, at closing. See our guide to VA approved builders in Central Texas at stealthgctx.com/blog/va-approved-builders-central-texas/.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate