Leander, Texas
General contractor in Leander
Custom homes, remodels, custom cabinetry, and commercial work in Leander, from established neighborhoods to new lots along the US 183 corridor. We walk the site, send an itemized fixed bid, and run the Leander permit from application to final inspection.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Building in Leander
How permits work in Leander
Everything is filed online. Leander processes building permit applications through its online Development Hub, which is also where permit status is tracked and inspections are requested. Applications expire 180 days after filing unless submittals are actively in progress.
What needs a permit. A permit is required before construction inside city limits. That includes new buildings, additions, remodels that move or remove interior walls or change electrical, mechanical, or plumbing, accessory buildings, pools, driveways, demolition, solar, water heaters, generators, and fences over seven feet. Painting, re-roofing, siding and window replacement, cabinets, flooring, drywall repair, and like-for-like fixture swaps do not. In the Leander ETJ, permits are generally limited to signs, driveways connecting to city-maintained roads, and water and wastewater connections.
Which codes apply. Leander has adopted the 2021 ICC code package and the 2023 electrical code with local amendments, and its 2021 Fire Code and amendments took effect July 1, 2025.
Contractors register first. Every general contractor and subcontractor needs an updated registration form on file with the city before the permit is issued, and plumbing, electrical, and mechanical contractors must be licensed by the State of Texas. We register our crew and trade partners and list them on the application.
What a new home submittal needs. The city's checklist calls for a plot plan with setbacks and easements, a landscape plan, stamped engineered foundation and wind-bracing plans, an energy compliance report, and Manual J, S, and D load calculations. Homes over 6,000 square feet, or lots with a long steep drive, also need a topographic map.
Septic lots. For remodels and additions on a septic system, Leander asks for an approved OSSF form or a letter from the county showing the existing system is sized for the added use. We confirm that before the design is final.
Review timelines. The city posts first-review targets of 10 business days for a new single-family home, an addition, or a residential remodel, with 5-day re-reviews. Commercial remodels and tenant finish-outs are 10 business days, new commercial buildings 15, and certificates of occupancy 3.
Inspections. Requests made before 4 p.m. are typically inspected the next business day. Fire finals are scheduled separately with the Fire Marshal's office.
Commercial sites. Leander requires a site development permit for all development except single-family houses on individually platted lots. Projects adding under 1,000 square feet of impervious cover can use a minor site development application, and interior finish-outs that don't increase the footprint or change parking requirements are exempt. When site work is required, the city issues a Certificate of Completion for it before the building's certificate of occupancy.
Opening a business. A certificate of occupancy is needed when a building's use or its owner or occupant changes. Leander requires a pre-application meeting with building, fire, and planning staff before the application, and both a building and a fire inspector visit before the certificate is issued. See our commercial finish-out work.
Trees. Owners of a completed, occupied home can remove a tree without a permit, though a front-yard tree may need to be replaced to meet landscape requirements. On development projects, removing a heritage tree over 26 caliper inches requires Planning and Zoning Commission and City Council approval.
Source: City of Leander: Permits & Building Inspection · Development Process and review timelines · Development Guide · Residential application requirements · Site Development · Certificate of occupancy submittal packet · Fire Inspection & Compliance · Landscaping FAQ · Tree removal request packet · Reviewed Nov 2026
Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.
Nearby work
Recent work near Leander

Cedar Park storage facility
All concrete on a self-storage facility: retaining walls, footings, slabs, and paving.
View project →
Custom cabinets, vanities, and closets
White oak, walnut, black, and shaker kitchens, islands, bath vanities, and linen towers.
View project →
A house and an ADU on Vargas Street, set up as two condos
Infill development: a new house and ADU on one lot, built and then set up as a two-unit condo regime.
View project →Services in Leander
Custom Homes in Leander
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →Design-Build in Leander
One contract from first sketch to final walkthrough.
Learn more →Full Home Remodeling in Leander
Whole-home, kitchen, bath, and addition remodels.
Learn more →Commercial Tenant Finish-Out in Leander
Office, retail, restaurant, and medical suites built to lease.
Learn more →Custom Cabinetry in Leander
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →Civil & Site Work in Leander
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Nearby
Also serving
Questions
Common questions
Do I need a permit to remodel in Leander?
If the remodel relocates or removes interior walls or changes electrical, mechanical, or plumbing, yes. Re-roofing, siding, window replacement, paint, cabinets, and flooring generally don't need one. We confirm with the city before we bid.
Do contractors have to register in Leander?
Yes. All contractors and subcontractors must be registered with the City of Leander before the permit is issued. We handle it for our crew and trade partners.
How long does Leander take to review a building permit?
The city's posted target is 10 business days for the first review of a new home, addition, or residential remodel, and 5 business days for each re-review. Commercial remodels and tenant finish-outs are 10 business days. Complete plans keep a job on that track.
Can I add on to a Leander home that's on septic?
Usually, but the city asks for an approved OSSF form or a county letter showing the existing septic system is sized for the added use before it will permit the remodel or addition. We check this early in design.
What does it take to open a business in a Leander space?
A certificate of occupancy, which starts with a required pre-application meeting with city building, fire, and planning staff. Any finish-out work is permitted separately, and both a building and a fire inspection are required before the certificate is issued.
Do you build commercial projects in Leander?
Yes. We handle the site development permit, concrete and site work, and the building, from finish-outs to ground-up work.
Can I use a VA loan to build with you in Leander?
Yes, if your lender offers VA construction financing and accepts us through its builder review. Since March 31, 2025, the VA no longer requires a builder ID for most new construction loans. Builders sign the VA one-year warranty, Form 26-1859, at closing. See our guide to VA approved builders in Central Texas at stealthgctx.com/blog/va-approved-builders-central-texas/.
How do I get an estimate?
Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.