Commercial Tenant Finish-Out · Retail Buildouts
Retail finish-out and store build-out contractor in Austin, TX
Retail store build-outs in shopping centers, strip centers, and street-front space. We self-perform demolition, steel stud framing, drywall, ceilings, and finishes, work to your landlord’s tenant criteria, and build to your opening date. Our crews are working at Hill Country Galleria in Bee Cave now.

- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
Retail Buildouts services
Storefronts and entries
Storefront framing and openings, entry doors, and the accessible route from the parking lot to the door.
Sales floors
Open floor plans, feature walls, slatwall and display backing, flooring, and paint.
Fitting rooms and checkout
Fitting rooms, cash wraps, and service counters, including an accessible counter section.
Stockrooms and back of house
Demising and stockroom walls, restrooms, break rooms, and receiving doors.
Ceilings and lighting
Open-to-structure, acoustic grid, or drywall ceilings, with track and display lighting by licensed electricians.
Signage coordination
Blocking and power at the sign band, and scheduling around the sign contractor’s permit and install.
Planning a retail buildout
What decides an Austin retail build-out
The landlord’s tenant criteria. Shopping centers and malls usually have design criteria for storefronts, signs, ceilings, and work hours, plus a work letter that splits landlord work from tenant work. We price the two as separate lines and build to the criteria. See our TI allowance guide.
The permit. Commercial remodels in Austin go through commercial building plan review for building, fire, and energy code (City of Austin: commercial plan review). A change of use, such as office to retail or retail to food service, can add restroom, exit, and parking requirements, so we check it before you sign.
Smaller stores can move faster through review. Austin's commercial plan review lists 10 business days per review for a remodel up to 25,000 square feet. An interior finish-out under 10,000 square feet can use the Small Project application, reviewed in about 5 business days, and a qualifying finish-out of 5,000 square feet or less inside an existing building can use Quick Turnaround review in one business day (City of Austin: commercial plan review). Quick Turnaround permits can't be revised later, so the plans need to be final before you use it. Most in-line shopping center spaces fall under these size limits, so we check which path fits before the design is finished.
Accessibility. Retail stores are public accommodations. Projects of $50,000 or more are registered with TDLR, reviewed by a Registered Accessibility Specialist, and inspected after construction (TDLR: architectural barriers at a glance). That covers the route from parking, the entry, fitting rooms, restrooms, and counters.
Signs are a separate permit. In Austin, outdoor signs need their own sign permit from a registered sign contractor, and lit signs also need an electrical permit and inspection (City of Austin: sign permits). We frame the blocking and run power so the sign goes up on schedule.
Opening date. Rent usually starts before your first sale. You get a schedule with the bid that works back from your opening, including fixtures and long-lead items. See the tenant finish-out timeline.
Our work
Related projects and guides

Hill Country Galleria, Bee Cave
Active finish-out work: demolition, steel stud framing, a bar rebuild, and paint.
See the project →
Finish-out cost factors
What moves the number on a commercial finish-out.
Read the guide →
TDLR accessibility review
Registration, RAS review, and inspection for Texas finish-outs.
Read the guide →Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
Retail Buildouts across Central Texas
Questions
Common questions
How much does a retail build-out cost in Austin?
Shell condition, how much of the last tenant’s work can stay, the storefront, and the finish level drive it. We don’t publish ranges. We walk the space and send an itemized fixed bid with landlord and tenant work separated.
Do I need a permit for a retail build-out in Austin?
Yes, for most work beyond paint and fixtures. The city reviews building, fire, and energy code, and projects of $50,000 or more also need TDLR accessibility registration. Outdoor signs need a separate sign permit.
How long does a retail finish-out permit take in Austin?
Austin lists 10 business days per review for a commercial remodel up to 25,000 square feet. Finish-outs under 10,000 square feet can use the Small Project application at about 5 business days, and qualifying finish-outs of 5,000 square feet or less can use Quick Turnaround review in one business day. Comment rounds, landlord approval, and TDLR review add time, so we build them into the schedule.
Can you work to my landlord’s tenant criteria and work hours?
Yes. We build to the center’s design criteria and schedule noisy work around their hours, including nights when a mall requires it.
What is the difference between a build-out, a finish-out, and tenant improvements?
They mean the same work. Build-out is the common search term, finish-out is the usual Texas term, and tenant improvements is the lease term for the work the allowance pays for.
Do you build retail spaces outside Austin?
Yes, across Central Texas, including Bee Cave, Round Rock, Cedar Park, Georgetown, Pflugerville, Kyle, and Buda.