StealthGeneral Contracting
Call

Lakeway, Texas

General contractor in Lakeway

Luxury custom homes, hillside foundations, whole-home remodels, and custom cabinetry around Lake Travis. Many Lakeway lots are steep and rocky, and many sit in subdivisions with their own architectural review, so we plan the site work and the approvals before the design is final.

Walnut slab-front kitchen cabinetry with a full-height marble backsplash by Stealth General Contracting
Walnut kitchen, one of our custom cabinetry projects

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Lakeway

What to know before you build or remodel in Lakeway

Lakeway permits more than most cities. Lakeway requires a city building permit to build, enlarge, alter, or demolish, and also for work many cities exempt: fences, siding replacement, driveway replacement, flatwork, retaining walls, re-roofing with a change in material, window or door replacement that changes framing, decks, boat docks, mold remediation, and major landscaping or drainage work. Plumbing work also needs a permit through the local water and wastewater provider.

What usually doesn't. Painting, flooring, tile, cabinetry, countertops, and trim usually don't need a permit. Minor landscaping is exempt, but flatwork, stairs, retaining walls, and French drains are not.

Architectural Control comes first. When a subdivision has an Architectural Control board, the city asks for proof that the project was submitted to it as part of the permit application. We prepare the drawings and submittals for both.

Septic lots and LCRA. LCRA administers the state's septic (OSSF) rules as TCEQ's authorized agent within 2,000 feet of Lake Travis. On septic lots, the septic plans as submitted to LCRA go in with the Lakeway building permit, and the city may ask for LCRA's receipt before issuing it. Remodels, additions, pools, decks, and garages on septic lots also go through LCRA review.

Which codes apply. Lakeway builds to the 2021 International codes, with the 2021 Fire Code as amended by Travis County ESD No. 6, and the 2023 National Electrical Code.

Licensed trades sign in person. Before a permit is issued, the licensed master plumber, master electrician, mechanical contractor, and septic installer, where applicable, provide their licenses and sign the permit in person at Building and Development Services. The permit must be posted on the front of the property before work starts.

Online permits and inspections. Permit applications and inspection requests go through Lakeway's Civic Self Service portal, where contractors register to validate licensing. Inspections requested by 4 p.m. the business day before make that day's schedule.

Plan review time. The city says new building submittals take a minimum of 12 to 15 days to review, with re-reviews in 5 to 7. Site development and small project plans can take up to 30 days for the first review, and an on-site pre-construction meeting to check erosion controls and tree protection comes before that permit is issued.

Trees. A protected tree in Lakeway is a hardwood with a trunk 16 inches in diameter at 4.5 feet above ground, and removing one takes a tree removal permit. New residential construction needs a tree survey by a licensed surveyor showing hardwoods 6 inches and larger, and oaks can't be pruned from February 1 through June 30.

Hillside retaining walls. Lakeway's Design Manual requires retaining walls over 4 feet to be detailed in the site development plans, with no deferred submittals. Terraced walls need 10 feet of horizontal separation, and exposed concrete facing a road or neighbor must be veneered.

Commercial projects. Non-residential and multifamily plans are also reviewed by the Fire Chief and the water and sewer provider, and food or beverage projects by the Travis County Health Department. Each Lakeway business also needs a city business license.

Source: City of Lakeway: Inspections · Building permit requirements · How do I apply for a permit? · Adopted building codes · Lakeway Design Manual · Site development and small project checklist · Oak pruning schedule · LCRA: On-Site Sewage Facilities Program · LCRA: On-site sewage FAQs · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Lakeway

See all projects →

Services in Lakeway

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

Do I need HOA or Architectural Control approval in Lakeway?

If your subdivision has an Architectural Control board, yes, and the city asks for proof of that submittal with the building permit application. We prepare both packages.

Do you build on steep Lakeway lots?

Yes. Hillside homes are a specialty. Our crews self-perform the excavation, stepped foundations, cast-in-place retaining walls, and multi-level slabs these lots need.

Does a fence or driveway need a permit in Lakeway?

Yes. Lakeway's permit requirements include fences, driveway replacement, flatwork, and retaining walls, along with re-roofing when the material changes.

Do I need LCRA approval to remodel or add on to a home with septic in Lakeway?

Often, yes. Within 2,000 feet of Lake Travis, LCRA reviews remodels and additions against the septic system's licensed capacity, and site improvements like pools, decks, and garages through its site plan review. The city also asks for the LCRA septic submittal with the building permit.

Can I remove or trim trees on my Lakeway lot?

Removing a protected tree, a hardwood 16 inches or more in diameter, takes a city tree removal permit, and new homes need a tree survey. Oaks can't be pruned from February 1 through June 30 because of oak wilt risk.

What building codes does Lakeway use?

The 2021 International codes, including the building, residential, energy, and existing building codes, the 2021 fire code as amended by Travis County ESD No. 6, and the 2023 National Electrical Code.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate