Project · Structural repair
Failed retaining wall, apartment building
A retaining wall under an occupied apartment building had failed, washing out the soil beneath the slab edge. We shored up the building, formed along the old slab, pumped flowable fill underneath to stabilize it, and built a new reinforced concrete retaining wall, saving the building from further structural damage.

Phase 01
The failure
The old rock retaining wall collapsed and the slope eroded back under the building, leaving the slab edge and utilities hanging over open voids.




Phase 02
Shoring the building
Before any digging, we shored the building to carry the slab edge and keep the structure from moving further.



Phase 03
Demolition and excavation
Removing the failed wall and debris, then excavating a clean cut and footing line along the building.






Phase 04
Forming the old slab and flowable fill
We formed along the edge of the old slab and pumped flowable fill under it, filling the voids and giving the slab solid bearing again.

Phase 05
New retaining wall
Reinforced footing and a tall cast-in-place concrete wall, with rebar mats tied by our crew.






Phase 06
Finished wall
The completed retaining wall supporting the building, with the site regraded and revegetating below.





Questions
Common questions
Can you repair a failed retaining wall under a building?
Yes. On this apartment building we shored the structure first, then removed the failed wall, stabilized the slab with flowable fill, and built a new reinforced concrete wall.
What is flowable fill used for?
Flowable fill is a low-strength, self-leveling cement mix. Pumped under an undermined slab, it fills voids completely and restores support without heavy compaction.
Do you shore buildings during repairs?
Yes. We install temporary shoring to carry the structure while excavation and new wall construction happen beside it, with engineering where required.