Project · Avenue N
Avenue N commercial site work
Site and concrete work for a new flex-warehouse building: foundation and site walls, a retaining wall along the tree line, drainage, sidewalks, curbs, asphalt paving, and fire-lane striping.

Video
Watch the project on YouTube
Phase 01
Foundation and site walls
Footings, rebar, and concrete walls along the building.



Phase 02
Retaining wall and drainage
A formed retaining wall built around the existing trees, with drainage behind it.


Phase 03
Sidewalks and curbs
Reinforced sidewalks and curbs, finished with sod.



Phase 04
Asphalt paving and striping
Base, asphalt paving, and fire-lane striping.



Phase 05
Finished site
The completed drive, curbs, and building frontage.
Questions
Common questions
Do you do commercial site work and paving?
Yes. On the Avenue N project we built concrete site walls, a retaining wall, drainage, sidewalks, curbs, asphalt paving, and fire-lane striping.
Can you build retaining walls around existing trees?
Yes. We form walls to work around protected trees and add drainage behind them.
Do you self-perform concrete?
Yes. Footings, walls, sidewalks, and curbs are poured by our own crews.