StealthGeneral Contracting
Call

Manor, Texas

General contractor in Manor

Custom homes, remodels, commercial buildings, and site work in Manor, east of Austin. East of I-35 the soil is often expansive clay, so we plan the pad, the foundation, and the drainage as carefully as the house or building on top.

Graded building pad after mass excavation and fill by Stealth General Contracting
Austin supermarket site earthwork

5.0 on Google5 reviewsRead reviews on Google (opens in a new tab)

  • Every project walked and bid onsite
  • Itemized fixed bids, one lump-sum total
  • In-house crews; licensed trades for electrical, plumbing, and HVAC
  • Team-led installs with quality control at every stage

Building in Manor

How permits work in Manor

GovWell for permits and registration. Manor moved building permit applications and contractor registration to the GovWell online system in 2026. Inspections are requested in the same system the permit was applied for in.

Engineered foundations. The city's residential permit guidelines call for a foundation plan and details signed and sealed by an engineer, along with floor, electrical, and energy-code (ResCheck) documents and an electrical service load analysis. Larger buildings, those with clear spans over 24 feet, and non-standard construction also need an engineer's stamp.

Driveways, sidewalks, and fences need permits too. Manor requires a permit to build, replace, or add to a driveway or sidewalk, or to change the approach. Fences on platted lots in city limits need a permit as well; side and rear fences top out at 6 feet and front-yard fences at 3 feet.

Start after the permit, not before. The city's fee schedule doubles permit fees for work started before a permit is issued. We don't break ground until the permit is in hand.

Platted lot and site plan. The city's development process lists an approved site plan and a platted lot as prerequisites for a building permit on vertical construction, with a 14 to 30-day approval process. Site plans are required for all development in city limits and Shadowglen except single-family homes.

Check the water and sewer taps. On new homes, water and wastewater impact fees can be a large part of the permit cost. The city says no impact fee is needed if the property has had water and wastewater service before, and Public Works can verify existing taps. We check this before we price a lot.

Inside city limits or the ETJ? The City of Manor does not regulate land use in its extraterritorial jurisdiction (ETJ); Travis County issues permits there. We confirm which one applies to your address first.

New codes in 2027. Manor has adopted the 2021 International codes, including the IRC and IECC, for permits submitted on or after January 1, 2027. Plans drawn now for a 2027 submittal should meet the new editions.

Clay soils. East of I-35 much of the soil is expansive clay. We plan the building pad, footings, and drainage around it, the part of the job our own concrete and civil crews handle.

Source: City of Manor: Building Permits · Building Permit Resources · Residential permit guidelines · Driveways and sidewalks · Fences · Development Process · Zoning · Fee schedule · Reviewed Nov 2026

Rules change, and we confirm the current requirements for your address before we bid. Questions about a specific property? Call or text 737-285-2969.

Nearby work

Recent work near Manor

See all projects →

Services in Manor

How it works

Five steps, one point of contact

  1. 01

    Walk the site

    We measure, photograph, and talk through goals, budget, and timing.

  2. 02

    Design and price

    Drawings, selections, and a fully itemized proposal with one lump-sum total.

  3. 03

    Permits and schedule

    We handle permitting and lock a realistic build schedule.

  4. 04

    Build

    Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.

  5. 05

    Walkthrough

    Punch list, final inspections, and a clean handoff.

Request an estimate

Start with an onsite walk

Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.

  1. Onsite walk. We see the lot, home, or space in person.
  2. Itemized fixed bid. Every scope line listed, one total.
  3. Build. Our crews and licensed trades, one point of contact.

Preferred contact

We’ll schedule an onsite walk — photos welcome by text after you submit. Sending opens your email app with everything filled in, addressed to [email protected].

Prefer to talk? Call or text 737-285-2969, Mon–Fri 8am–5pm.

Nearby

Also serving

Questions

Common questions

How do I get a building permit in Manor?

Applications go through the city's GovWell system, where contractors also register. New vertical construction needs an approved site plan and a platted lot. We prepare and submit the package.

Do contractors register with the City of Manor?

Yes. Contractor registration is handled in GovWell alongside building and trade permits.

Do you do site work and foundations in Manor?

Yes. Our crews self-perform earthwork, building pads, footings, slabs, retaining walls, drainage, and paving, which matters on expansive clay soils.

Do I need a permit for a driveway or fence in Manor?

Yes, in most cases. Manor requires a permit to build, replace, or add to a driveway or sidewalk, and a fence permit on platted lots inside city limits. Side and rear fences are limited to 6 feet and front-yard fences to 3 feet.

Does Manor require an engineered foundation?

Yes. The city's residential permit guidelines call for foundation plans and details signed and sealed by an engineer. On Manor's expansive clay, that engineering matters.

Who issues permits outside Manor city limits?

In Manor's ETJ, the city does not regulate land use and Travis County issues permits. We check jurisdiction for your address before we bid.

How do I get an estimate?

Request an estimate online, call or text 737-285-2969, or email [email protected]. We schedule an onsite walk, then send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate