StealthGeneral Contracting
Call

Project · Austin area

Custom primary bath with marble-look steam shower

A completed custom primary bath built around bold black-and-white marble-look porcelain. Large-format tile runs from the floor to the ceiling and wraps the steam shower, the tub deck, and the shower ceiling. The steam shower closes with a frameless glass door, fixed panels, and a glass transom up to the ceiling to hold steam, with a tiled bench, a recessed niche, a tiled window return, and a black hex mosaic floor. The drop-in tub sits on a matching tile-wrapped deck with a black hex top.

Custom primary bath with marble-look steam shower, custom bathroom in the Austin area
TypeCustom primary bath and steam shower
LocationAustin area, TX
ScopeLarge-format tile walls and ceiling, glass steam enclosure with transom, tiled bench and niche, hex mosaic floor, tile-wrapped tub deck
StageComplete

Phase 01

Finished bathroom

The shower and tub share one continuous run of large-format, book-style porcelain. Thin black edge trim outlines every outside corner, and the tile stops cleanly at the ceiling across the whole wet wall.

Steam shower and tub deck wrapped in black-and-white marble-look porcelain, custom bathroom in the Austin area
Steam shower and tub deck wrapped in black-and-white marble-look porcelain
The glass enclosure, tub deck, and black accent wall with the window stack, custom bathroom in the Austin area
The glass enclosure, tub deck, and black accent wall with the window stack

Phase 02

Inside the steam shower

A glass door and fixed panels close the shower, with a glass transom running to the tiled ceiling so the steam stays inside. A fixed head and a second head on an extension arm share brushed-nickel controls, with a recessed niche and a tiled bench beside the window.

Two shower heads, recessed niche, tiled window return, and the glass transom to the ceiling, custom bathroom in the Austin area
Two shower heads, recessed niche, tiled window return, and the glass transom to the ceiling
Frameless glass door, tiled bench, and black hex mosaic shower floor, custom bathroom in the Austin area
Frameless glass door, tiled bench, and black hex mosaic shower floor

Questions

Common questions

Do you build custom steam showers?

Yes. This steam shower was built with tile on the walls and ceiling, a glass door and fixed panels, and a glass transom to the ceiling, with licensed plumbing and electrical trades on the systems that require them.

Can large-format tile go on a shower ceiling?

Yes. Large-format porcelain can be set on walls and ceilings when the substrate is flat and waterproofed and the tile is set with full coverage, which gives a steam shower fewer grout lines and a continuous look.

How do you price a custom bathroom remodel?

Every project is walked onsite, then bid with an itemized fixed bid and one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate