Project · Austin area
Custom steam shower and bathroom remodel
A primary bath rebuilt around a glass-enclosed wet room. The shower and a freestanding soaking tub share one enclosure of frameless glass, wrapped floor to ceiling in large-format blue onyx-look porcelain slabs over a hexagon mosaic floor. Outside the glass, the same slabs carry across the wall around custom painted doors and a linen tower, with marble-look porcelain on the bathroom floor.

Phase 01
Glass enclosure and slab install
Large-format porcelain slabs were book-matched up the shower walls and the hex mosaic was set across the wet-room floor, then the frameless glass panels and door were hung on a full-length threshold.


Phase 02
Finished wet room and bath
The freestanding tub sits inside the glass with the shower, so the whole wet area is enclosed. Outside the enclosure, the slabs run across the wall around custom painted doors and a recessed linen tower.



Other baths
More Stealth bathroom remodels
Two other bathroom remodels by our crews: a finished white subway-tile bath with a freestanding tub on a raised tiled platform, and a gray marble-look slab bath shown during install.




Questions
Common questions
Do you build steam showers?
Yes. Steam showers need glass and tile that run to the ceiling, a vapor-tight waterproofing system, and a steam generator. We build the enclosure and finishes, with licensed plumbing and electrical trades on the systems that require them.
Can a freestanding tub go inside the shower enclosure?
Yes. On this bath the tub and shower share one glass-enclosed wet room, with the floor sloped to drain and waterproofed wall to wall.
How do you price a bathroom remodel?
Every project is walked onsite, then bid with an itemized fixed bid and one lump-sum total.