Project · Hutto, TX

Pool house addition, in progress

An active project in Hutto: we are adding 1,200 square feet of living space onto an existing pool house so a family's grandparents can live steps from their grandbaby. Foundation, framing, roofing, rough-ins, drywall, and stucco are underway. We'll add photos as work continues.

Pool house addition, in progress, pool house addition in Hutto
TypeAddition to existing pool house
LocationHutto, TX
Size1,200 SF new living space
StatusIn progress

Phase 01

The existing pool house

The original pool house before the addition, with the new footprint laid out beside it.

Existing pool house before construction, pool house addition in Hutto
Existing pool house before construction
Side of the existing pool house where the addition ties in, pool house addition in Hutto
Side of the existing pool house where the addition ties in

Phase 02

Foundation and plumbing

Trenching the grade beams, setting under-slab plumbing, and forming the slab.

Grade beam trenches beside the pool house, pool house addition in Hutto
Grade beam trenches beside the pool house
Under-slab plumbing in the trenches, pool house addition in Hutto
Under-slab plumbing in the trenches
Plumbing rough-in before the pour, pool house addition in Hutto
Plumbing rough-in before the pour
Slab forms set for the addition, pool house addition in Hutto
Slab forms set for the addition

Phase 03

Framing

Wall framing and roof structure tied into the existing building.

Lumber delivered and first walls framed, pool house addition in Hutto
Lumber delivered and first walls framed
Gable wall framing going up, pool house addition in Hutto
Gable wall framing going up
Walls framed beside the pool, pool house addition in Hutto
Walls framed beside the pool
Full addition framed with roof structure, pool house addition in Hutto
Full addition framed with roof structure

Phase 04

Roof and dry-in

Roof decking, shingles, and wall sheathing to get the addition dried in.

Roof decking going on, pool house addition in Hutto
Roof decking going on
Rafters and decking at the tie-in, pool house addition in Hutto
Rafters and decking at the tie-in
Shingles going on over the decking, pool house addition in Hutto
Shingles going on over the decking
Wall sheathing and weather barrier, pool house addition in Hutto
Wall sheathing and weather barrier
Addition dried in with roof complete, pool house addition in Hutto
Addition dried in with roof complete

Phase 05

Windows and rough-ins

Windows set, then electrical, plumbing, and HVAC rough-in through the framing.

Windows installed on the addition, pool house addition in Hutto
Windows installed on the addition
Window openings on the gable end, pool house addition in Hutto
Window openings on the gable end
Interior framing with rough-ins started, pool house addition in Hutto
Interior framing with rough-ins started
Ductwork and rough-ins in the framing, pool house addition in Hutto
Ductwork and rough-ins in the framing
HVAC and electrical rough-in in the ceiling, pool house addition in Hutto
HVAC and electrical rough-in in the ceiling
Open interior with rough-ins complete, pool house addition in Hutto
Open interior with rough-ins complete

Phase 06

Drywall and stucco (underway)

Drywall going up inside while the crew applies stucco to the exterior.

Drywall hung on the ceilings, pool house addition in Hutto
Drywall hung on the ceilings
Drywall finishing in the main living area, pool house addition in Hutto
Drywall finishing in the main living area
Crew applying stucco over the new walls
Stucco going on the addition, pool house addition in Hutto
Stucco going on the addition
Stucco base coat on the rear wall, pool house addition in Hutto
Stucco base coat on the rear wall
Exterior stucco in progress, pool house addition in Hutto
Exterior stucco in progress

Questions

Common questions

Can you add living space to a pool house or detached building?

Yes. In Hutto we are adding 1,200 square feet of living space onto an existing pool house, with a new foundation, framing, roof, and all-new rough-ins.

Do you build in-law suites and family additions?

Yes. This addition gives a family's grandparents their own living space steps from the main house.

Do you handle stucco and exterior finishes?

Yes. Our crews apply stucco and coordinate siding, roofing, and windows so the addition matches the existing building.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.