Project · Central Texas

5,500 SF custom home build

A ground-up single-story custom home of about 5,500 square feet on a wooded Central Texas lot. Board-and-batten siding over a stone wainscot, cedar-post entry porches, black windows, and a long paver walk, with the septic system, drainage, and concrete flatwork built alongside the house.

5,500 SF custom home build, custom home build in Central Texas
TypeGround-up custom home
Size5,500 SF
LocationCentral Texas
StageExterior, flatwork, and landscaping complete

Phase 01

Framing, roof, and siding

The house framed and roofed, then wrapped and sided in board and batten with scaffolding around the gables.

Front gables with scaffolding during siding, custom home build in Central Texas
Front gables with scaffolding during siding
Rear of the house with siding underway, custom home build in Central Texas
Rear of the house with siding underway
Garage wing and gables during exterior work, custom home build in Central Texas
Garage wing and gables during exterior work
Covered porch framing and siding at the back of the house, custom home build in Central Texas
Covered porch framing and siding at the back of the house
Board-and-batten siding with the base prepped for stone, custom home build in Central Texas
Board-and-batten siding with the base prepped for stone

Phase 02

Interior

Drywall hung and a wide multi-panel slider opening the living area to the back porch.

Drywall complete in the main living area with the rear slider installed, custom home build in Central Texas
Drywall complete in the main living area with the rear slider installed

Phase 03

Stone, septic, and drainage

Stone wainscot set around the base of the house while the septic tank and long drainage trenches went in across the lot.

Stone wainscot complete on the front elevation, custom home build in Central Texas
Stone wainscot complete on the front elevation
Front of the house with stone and porches finished, custom home build in Central Texas
Front of the house with stone and porches finished
Septic tank set in place, custom home build in Central Texas
Septic tank set in place
Long trench with drain pipe across the lot, custom home build in Central Texas
Long trench with drain pipe across the lot
Corrugated drain line in the trench, custom home build in Central Texas
Corrugated drain line in the trench
Trench cut through rock beside the house, custom home build in Central Texas
Trench cut through rock beside the house

Phase 04

Flatwork

Forms and rebar for the driveway apron, entry steps, and curved front walk.

Lot graded and staked in front of the garage, custom home build in Central Texas
Lot graded and staked in front of the garage
Curved front walk and entry steps formed with rebar, custom home build in Central Texas
Curved front walk and entry steps formed with rebar

Phase 05

Finished exterior

Sod down, paver walk in, and the exterior complete.

Finished front elevation under the oaks, custom home build in Central Texas
Finished front elevation under the oaks
Side elevation with paver walk and fire pit, custom home build in Central Texas
Side elevation with paver walk and fire pit
Rear corner with stone base and paver walk, custom home build in Central Texas
Rear corner with stone base and paver walk
Entry porch with cedar posts and stone columns, custom home build in Central Texas
Entry porch with cedar posts and stone columns
Front gable with stone wainscot and black windows, custom home build in Central Texas
Front gable with stone wainscot and black windows

Questions

Common questions

Do you build ground-up custom homes?

Yes. This 5,500 square foot home was built from the foundation up, including framing, roofing, siding, stone, septic, drainage, and flatwork.

Can you build on rural lots with septic?

Yes. On this home the septic tank and drain lines were installed as part of the build, and we coordinate the designer, permit, and inspections for the system.

Do you handle the site work and flatwork too?

Yes. We self-perform excavation, trenching, forming, and concrete, so the driveway, walks, and steps are built by the same team as the house.