183 toll road extension: 38 hand holes set along the corridor
Underground utility work on the 183 toll road extension. Our crew trenched along the frontage, ran conduit, and set 38 precast concrete hand holes along the corridor, each wrapped with bare copper ground wire, tied into the conduit runs, collared in concrete, and brought to finished grade with its lid. Work is ongoing; we'll add photos as the corridor progresses.

Phase 01
Trenching along the corridor
Trench cut with a mini excavator along the frontage road, between the sidewalk and the right-of-way fence, with traffic control in place.



Phase 02
Conduit runs
Conduit laid in the trench between hand holes, with steel risers coming up at the utility poles.


Phase 03
Setting the hand holes
Each precast concrete hand hole is set on line and grade, with the conduits brought in at the base and bare copper ground wire wrapped around the barrel.





Phase 04
Concrete collars
Concrete placed around the conduit entries to lock the hand hole and conduits in place before backfill.



Phase 05
Finished at grade
Backfilled and brought to grade, with the lid set flush in the right-of-way.


Questions
Common questions
Do you do roadway underground utility work?
Yes. On the 183 toll road extension our crew is trenching, running conduit, and setting precast hand holes along the corridor, with 38 set so far.
What is a hand hole?
A hand hole is a small underground access box, here a precast concrete barrel with a lid, where conduits meet so cable can be pulled, spliced, and serviced later without digging up the run.
Do you self-perform the trenching and concrete?
Yes. Excavation, conduit placement, setting the structures, concrete collars, and backfill are done by our own crews and equipment.
How do you price civil and utility work?
Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.