Project · 183 toll road extension, Austin area

183 toll road extension: 38 hand holes set along the corridor

Underground utility work on the 183 toll road extension. Our crew trenched along the frontage, ran conduit, and set 38 precast concrete hand holes along the corridor, each wrapped with bare copper ground wire, tied into the conduit runs, collared in concrete, and brought to finished grade with its lid. Work is ongoing; we'll add photos as the corridor progresses.

183 toll road extension: 38 hand holes set along the corridor, 183 toll road extension underground utility work near Austin, TX
TypeRoadway underground utilities
Location183 toll road extension, Austin area
ScopeTrenching, conduit, precast hand holes, grounding, concrete collars, backfill to grade
Count38 hand holes set along the corridor
StatusIn progress

Phase 01

Trenching along the corridor

Trench cut with a mini excavator along the frontage road, between the sidewalk and the right-of-way fence, with traffic control in place.

Mini excavator setting a hand hole in the trench beside the frontage road, 183 toll road extension underground utility work near Austin, TX
Mini excavator setting a hand hole in the trench beside the frontage road
Trench along the corridor, seen from the excavator cab, 183 toll road extension underground utility work near Austin, TX
Trench along the corridor, seen from the excavator cab
Trench running down the frontage road toward the next hand hole, 183 toll road extension underground utility work near Austin, TX
Trench running down the frontage road toward the next hand hole

Phase 02

Conduit runs

Conduit laid in the trench between hand holes, with steel risers coming up at the utility poles.

Twin conduit runs in the open trench, 183 toll road extension underground utility work near Austin, TX
Twin conduit runs in the open trench
Steel conduit risers at a utility pole, 183 toll road extension underground utility work near Austin, TX
Steel conduit risers at a utility pole

Phase 03

Setting the hand holes

Each precast concrete hand hole is set on line and grade, with the conduits brought in at the base and bare copper ground wire wrapped around the barrel.

Precast hand hole set in the trench with conduit entering, 183 toll road extension underground utility work near Austin, TX
Precast hand hole set in the trench with conduit entering
Twin conduits entering the base of a hand hole, 183 toll road extension underground utility work near Austin, TX
Twin conduits entering the base of a hand hole
Conduit transitioning into the hand hole base, 183 toll road extension underground utility work near Austin, TX
Conduit transitioning into the hand hole base
Bare copper ground wire wrapped around the hand hole, 183 toll road extension underground utility work near Austin, TX
Bare copper ground wire wrapped around the hand hole
Ground wire wrap and conduit at a hand hole, 183 toll road extension underground utility work near Austin, TX
Ground wire wrap and conduit at a hand hole

Phase 04

Concrete collars

Concrete placed around the conduit entries to lock the hand hole and conduits in place before backfill.

Concrete collar placed at the conduit entries, 183 toll road extension underground utility work near Austin, TX
Concrete collar placed at the conduit entries
Finished concrete collar around the conduits, 183 toll road extension underground utility work near Austin, TX
Finished concrete collar around the conduits
Concrete placed over the conduit run at a hand hole, 183 toll road extension underground utility work near Austin, TX
Concrete placed over the conduit run at a hand hole

Phase 05

Finished at grade

Backfilled and brought to grade, with the lid set flush in the right-of-way.

Finished hand hole lid at grade beside the sidewalk, 183 toll road extension underground utility work near Austin, TX
Finished hand hole lid at grade beside the sidewalk
Finished hand hole lid along the right-of-way fence, 183 toll road extension underground utility work near Austin, TX
Finished hand hole lid along the right-of-way fence

Questions

Common questions

Do you do roadway underground utility work?

Yes. On the 183 toll road extension our crew is trenching, running conduit, and setting precast hand holes along the corridor, with 38 set so far.

What is a hand hole?

A hand hole is a small underground access box, here a precast concrete barrel with a lid, where conduits meet so cable can be pulled, spliced, and serviced later without digging up the run.

Do you self-perform the trenching and concrete?

Yes. Excavation, conduit placement, setting the structures, concrete collars, and backfill are done by our own crews and equipment.

How do you price civil and utility work?

Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate