Projects
Our work, phase by phase
Finished kitchens and homes, additions and remodels in progress, ground-up commercial buildings, and the concrete and civil work underneath them. Every project page shows the build from start to finish.

5,500 SF custom home build
A 5,500 SF ground-up custom home: board and batten, stone, cedar porches, septic, and flatwork.
View project →
Custom cabinets, vanities, and closets
Walnut, flat-panel modern, two-tone, and shaker kitchens, vanities, a linen tower, and closet built-ins.
View project →
The Wesson Residence, in progress In progress
A five-level, 6,500 SF hillside home renovated top to bottom: windows, kitchens, baths, plaster, stucco, and pool.
View project →
Two condos on Vargas Street
Design-build infill: design, demolition, and two new homes through finished exteriors.
View project →
Pool house addition, in progress In progress
1,200 SF of new living space added onto an existing pool house.
View project →
Old barn remodel, in progress In progress
A full gut of an old barn: all-new MEPs, structural support, envelope, siding, and metal roof.
View project →
Wahoo's Fish Tacos, South Shore
Ground-up restaurant and bar, from a cleared lot to opening day.
View project →
Avenue N commercial site work
Concrete site walls, retaining wall, drainage, sidewalks, curbs, asphalt paving, and striping.
View project →
Andy's Frozen Custard, Round Rock
Concrete paving, drive-thru lanes, curbs, sidewalks, and storefront flatwork.
View project →
Cedar Park storage facility
All concrete on a self-storage facility: retaining walls, footings, slabs, and paving.
View project →
30,000 SF slab poured in one day
A 30,000 SF slab placed in one day, with heavy spread footings and 88 anchor bolt sets.
View project →
Supermarket site earthwork
Demolition, mass excavation, fill and compaction, and a finished building pad.
View project →
Failed retaining wall, apartment building
Shored an occupied building, stabilized the slab with flowable fill, and built a new wall.
View project →
Oltorf apartments retaining walls and paving
Failing retaining walls demolished and rebuilt, and concrete paving repaired.
View project →
City of Buda skate park
A public concrete skate park: bowl, banks, ledges, stair set, rails, and planters.
View project →Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.