What flashing does
Every house has joints where one material meets another: where a roof meets a wall, where a window sits in siding, where a deck bolts to the house. Roofing and siding shed water across their faces, but they can't seal those joints on their own. Flashing bridges the gap. It is a piece of sheet metal or a waterproof membrane installed so that water running down the wall or roof lands on top of it and is carried back out, instead of into the framing.
The rule that makes it work is simple: each layer overlaps the one below it, like shingles. Water always runs downhill, so as long as every upper piece laps over every lower piece, it has no path in. The residential code says the same thing in plain terms: overlapped flashing has to be applied in shingle fashion (2024 IRC Section R703.4).
Where flashing goes on a house
Austin builds homes under the 2024 International Residential Code with local amendments (City of Austin). For walls, the code requires corrosion-resistant flashing at these locations (IRC R703.4):
- Exterior window and door openings
- Where chimneys or masonry meet frame or stucco walls
- Under and at the ends of copings and sills
- Continuously above projecting wood trim
- Where porches, decks, or stairs attach to a wood-frame wall or floor
- At wall and roof intersections
- At built-in gutters
For roofs, flashing is required at wall and roof intersections, wherever the roof changes slope or direction, and around roof openings like vents, skylights, and chimneys (IRC R903.2.1). A few roof details come up on almost every job:
- Step flashing. Where a sloped roof runs up against a wall, small bent pieces are woven in with each course of shingles. The code requires at least 4 inches up the wall and 4 inches onto the roof, and the wall leg has to run under the siding (IRC R905.2.8.3).
- Kickout flashing. Where a roof eave ends against a wall, a diverter has to turn the water away from the wall (IRC R903.2.1). Without it, a roof dumps water straight down the siding.
- Drip edge. Metal along the eaves and rakes that keeps water off the fascia and sheathing edge, required on shingle roofs (IRC R905.2.8.5).
- Crickets. A small peaked section behind any chimney or penetration more than 30 inches wide, so water splits around it instead of pooling (IRC R903.2.2).
Why flashing matters so much
A flashing failure rarely looks like a leak at first. Water gets behind the siding or under the roofing and soaks the sheathing and framing for months before it shows up inside as a stain, soft drywall, or peeling paint. By then the repair is no longer a piece of metal. It is rotten plates, studs, or rafters, and sometimes mold. That is why flashing is one of the cheapest parts of a house to get right and one of the most expensive to get wrong.
Why flashing fails
- Wrong lap order. A piece tucked behind the layer below it instead of over it channels water in.
- Caulk instead of flashing. Sealant is a backup, not a flashing. Central Texas sun breaks it down, and once it cracks the joint is open.
- Missing pieces. Kickouts, head flashing over windows, and ledger flashing at decks are the parts most often skipped.
- Reused or damaged metal. Re-roofing over old, bent, or rusted step flashing saves a few hours and gives up the roof's weakest point.
- Mixed metals. Some metals corrode when they touch each other or treated lumber, so the flashing has to match the materials around it.
When flashing matters most
Any time a roof, wall, window, or deck changes, flashing gets cut, removed, or added. That includes room additions, window and door replacements, new siding, re-roofs, patio covers, and whole-home remodels. The tie-in between an old roof and a new one is the hardest of all; read why the roof tie-in is where addition leaks start. If you're already seeing stains or soft spots, start with our guide to the signs of bad flashing.
How we handle it
Our crews flash every opening and intersection in shingle order and use metal flashing instead of relying on sealant. On remodels we open up suspect areas before pricing the repair, so the bid covers the damage behind the wall, not just the trim on top of it. Call or text 737-285-2969 to have us walk your project.
Related services and guides
- Signs of bad flashing
- Flashing a room addition roof tie-in
- Home remodeling in Austin
- Home additions in Austin