The short version
Stock cabinets are built ahead of time in fixed sizes, usually in 3-inch width steps, with a short list of doors and finishes. Semi-custom cabinets are built to your order from a maker's catalog, with some changes to width, depth, or height and more door and finish choices. Custom cabinets are drawn and built to the room's own measurements, so every box, material, and detail is chosen for that space (Spindle Woodworks).
| Stock | Semi-custom | Custom | |
|---|---|---|---|
| Sizes | Fixed widths, filler strips close gaps | Catalog sizes plus some changes | Any dimension, built to the walls |
| Doors and finishes | Short list | Wider catalog | Any profile, species, or paint color the shop offers |
| Interior storage | Basic shelves | Catalog pull-outs and organizers | Planned around how you use the room |
| Typical lead time | Days to about 3 weeks | About 4 to 8 weeks | About 6 to 20 weeks, depending on the shop |
Lead times are industry ranges reported by Spindle Woodworks; your schedule depends on the shop, the finish, and how quickly selections are made. Lead time is the difference people tend to underestimate, and it often decides the remodel schedule more than anything else (Lily Ann Cabinets).

The grade does not set the quality
A stock cabinet can outlast a poorly built custom one. Durability comes from the box material, the joinery, the drawer slides and hinges, and the finish, not the label (Spindle Woodworks). Whichever route you take, ask about these:
- The box. Plywood, MDF, or particleboard, and how thick. Composite wood sold in the U.S. must be labeled compliant with the EPA's TSCA Title VI formaldehyde emission standards, which cover particleboard, MDF, hardwood plywood, and finished goods made with them (EPA).
- Drawers and hinges. Full-extension, soft-close slides and adjustable concealed hinges are what you touch every day.
- The finish. Painted, stained, or clear-coated, and whether it was sprayed in a shop or brushed on site.
- Certification, for factory cabinets. The ANSI/KCMA A161.1 seal means a factory cabinet line passed lab tests that include a 600-pound wall cabinet load, 25,000 door and drawer cycles, and finish tests against heat, humidity, and kitchen spills (KCMA). Both framed and frameless cabinets can be certified (KCMA). Site-built and small-shop custom cabinets usually aren't tested this way, so look at the materials and hardware instead.
Framed or frameless
This choice cuts across all three grades. Face-frame cabinets have a solid-wood frame on the front of the box, and the doors hang on it. Frameless cabinets skip the frame and hang the doors on the box sides with concealed cup hinges, which gives wider openings and a clean full-overlay look. Face frames suit traditional and inset styles, and the frame edge can be scribed to an uneven wall (Spindle Woodworks).
Where custom earns its keep
Standard widths work well in a square kitchen with standard appliances. Building to the room pays off when the room isn't standard, which is common in older Austin homes and remodels where walls have been moved:
- Walls that aren't square or plumb. Cabinets scribed to the wall close the gaps that stock boxes leave for fillers.
- Ceilings to finish. Uppers can run to the ceiling with stacked crown instead of leaving a dust shelf.
- Paneled appliances and range hoods. Wood-paneled refrigerators and a custom hood are built with the cabinetry so the lines match.
- Rooms beyond the kitchen. Walk-in closets, pantries, bookcases, media walls, and mudroom lockers rarely fit catalog sizes. See our closets and built-ins.


Keeping the boxes you have
If the layout works and the boxes are solid, new doors or a new finish may be all you need. Our sister company does cabinet painting and refinishing. If the layout is changing, plan the cabinets with the plumbing, electrical, and any wall changes so the rough-in lands where the boxes need it. Our kitchen remodel timeline shows where cabinet lead time fits.
How we handle cabinets
We build and install cabinetry sized to the room, and we coordinate the tops, tile, plumbing, and electrical so the kitchen or bath is finished under one contract. See examples on our custom cabinets page and the kitchens and vanities we've built. Every job is walked onsite and bid individually, with each run, the fronts and finish, hardware, and install listed in the bid.