StealthGeneral Contracting
Call

Project · West Milton, South Austin

West Milton exterior siding repairs, in progress

Exterior repairs on a modern two-story home off West Milton in South Austin. The tall vertical board-and-batten walls are repaired and primed, the windows are masked off, and the replacement panels for the dark center section are staged at the house. We'll add photos as the work moves forward.

West Milton exterior siding repairs, in progress, exterior siding repairs off West Milton in South Austin
TypeExterior siding repairs
LocationWest Milton, South Austin, TX
ScopeBoard-and-batten siding repair, prep, and prime
StatusIn progress

Video

Watch the project on YouTube

Watch on YouTube · More videos on our channel

Phase 01

Walkthrough

A walk down the side yard along the repaired walls.

Walking the side yard along the repaired and primed siding

Phase 02

Siding repaired and primed

The light-colored board-and-batten walls are repaired and primed from the ground to the roofline, with the battens and panel seams ready for finish paint.

Primed board-and-batten wall running the length of the side yard, exterior siding repairs off West Milton in South Austin
Primed board-and-batten wall running the length of the side yard
Primed battens and panel seams up close, exterior siding repairs off West Milton in South Austin
Primed battens and panel seams up close
Repaired siding on the tall rear wall under the oaks, exterior siding repairs off West Milton in South Austin
Repaired siding on the tall rear wall under the oaks

Phase 03

Windows and dark siding

Windows are masked and protected while the work goes on around them, and the replacement panels for the dark board-and-batten section are staged beside the house.

Masked window between the dark center section and the primed walls, exterior siding repairs off West Milton in South Austin
Masked window between the dark center section and the primed walls
Siding panels staged beside the tall window, exterior siding repairs off West Milton in South Austin
Siding panels staged beside the tall window

Questions

Common questions

Do you repair siding on modern homes in Austin?

Yes. Off West Milton in South Austin we are repairing tall vertical board-and-batten walls on a modern two-story home, then priming and prepping them for paint.

Can you match existing board-and-batten siding?

Yes. We repair or replace damaged panels and battens to match the existing layout, so the seams line up with the rest of the wall.

How do you price exterior repairs?

Every project is walked onsite, then bid with an itemized fixed bid and one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate