
Stealth General Contracting · Austin, Texas
Austin luxury custom homes, remodels & commercial construction
Built straight. Priced straight.
High-end custom homes, whole-home remodels, custom cabinetry, and commercial build-outs. Every project is walked and bid onsite, with one team accountable from drawings to final walkthrough.
- Every project walked and bid onsite
- Itemized fixed bids, one lump-sum total
- In-house crews; licensed trades for electrical, plumbing, and HVAC
- Team-led installs with quality control at every stage
What we build
Custom homes, remodels, and commercial work

Custom Homes
Ground-up luxury custom homes, including hillside lots and multi-level foundations.
Learn more →
Design-Build
One contract from first sketch to final walkthrough.
Learn more →
Full Home Remodeling
Whole-home, kitchen, bath, and addition remodels.
Learn more →
Commercial Tenant Finish-Out
Office, retail, restaurant, and medical suites built to lease.
Learn more →
Custom Cabinetry
Kitchens, vanities, closets, pantries, and built-ins, built to the room.
Learn more →
Civil & Site Work
Concrete, paving, drainage, underground utilities, retaining walls, and earthwork.
Learn more →Recent work
Finished work

Custom kitchens, vanities, and closets
Walnut, flat-panel modern, two-tone, and shaker kitchens, plus bath vanities, a recessed linen tower, and closet built-ins.
See the cabinetry →
Vargas Street homes, Austin
A new house and ADU on one Austin lot, built from demolition to finish, then set up as a two-unit condo regime.
See the build, phase by phase →
Wahoo's Fish Tacos, South Shore
From a cleared lot to opening day: site work, slabs, steel framing, envelope, patio concrete, and interior finish-out.
See the build, phase by phase →Google reviews
What clients say
“We are so happy with how our guest house turned out! From start to finish, they were wonderful to work with and really put care into every detail. You can tell they take pride in what they do, and it truly shows in their work. Everything turned out even better than we imagined, and we couldn’t be more grateful. We absolutely love our guest house and would recommend them to anyone looking for good, high-quality work from people who genuinely care about what they do.”
“I had a great experience. The team was professional, easy to communicate with, and took pride in their work. They kept things moving and made the process feel straightforward. I’d happily recommend them to anyone looking for a reliable construction company!”
“Love the quality of these guys work, so happy we ended up going with them… We will definitely be using them again!”
“Chris Jenkins and his team are incredible. We have had no issues all with our renovation. Everything has gone great with my Remodel.”
Civil and concrete
Site, concrete, and structural work

183 toll road extension
38 precast hand holes set along the corridor, with conduit, grounding, and concrete collars.
See the hand holes →
Avenue N commercial site work
Concrete site walls, retaining wall, drainage, sidewalks, curbs, asphalt paving, and striping.
See the site work →
Failed retaining wall repair
Shored an apartment building, stabilized the slab with flowable fill, and built a new wall.
See the repair →
30,000 SF slab in one day
Heavy spread footings, 88 anchor bolt sets, and round-the-clock concrete.
See the pour →
Oltorf apartments, Austin
Demolished failing retaining walls, built new ones, and repaired paving.
See the walls →
Cedar Park storage facility
All concrete: retaining walls, footings, slabs, and paving.
See the build →
City of Buda skate park
Bowl, banks, ledges, stairs, and rails for the city.
See the park →How we build
Watch a hillside home go up, stage by stage
From the three-phase foundation to framing, mechanical, electrical, and plumbing, finishes, and landscaping. Tap Narration to hear each step, or watch the narrated video on YouTube and see the 14 stages explained.


About
Team-led, built with a quality-control mindset
Stealth General Contracting is an Austin, Texas general contractor owned and run by Chris Jenkins. We build luxury custom homes, whole-home remodels, custom cabinetry, and commercial projects.
We are also a concrete and civil contractor, so our own crews handle the foundations, retaining walls, and site work that most builders hand off. Every project is walked and bid onsite, every bid is itemized with one lump-sum total, and you deal with one team from the first walk to the final walkthrough.
How it works
Five steps, one point of contact
- 01
Walk the site
We measure, photograph, and talk through goals, budget, and timing.
- 02
Design and price
Drawings, selections, and a fully itemized proposal with one lump-sum total.
- 03
Permits and schedule
We handle permitting and lock a realistic build schedule.
- 04
Build
Our own crews self-perform most work; licensed partners handle electrical, plumbing, and HVAC.
- 05
Walkthrough
Punch list, final inspections, and a clean handoff.
Request an estimate
Start with an onsite walk
Every project is walked and bid onsite. Tell us a little about it and we’ll set a time to see it, then send an itemized fixed bid with one lump-sum total.
- Onsite walk. We see the lot, home, or space in person.
- Itemized fixed bid. Every scope line listed, one total.
- Build. Our crews and licensed trades, one point of contact.
Your email app should have opened
Your request is filled in and addressed to [email protected]. Press send in your email app and it comes straight to us. We’ll get back to you to set up an onsite walk.
No email app opened? Copy the details and email them to [email protected], or call or text 737-285-2969. Photos are welcome by text at 737-285-2969.
Service area
General contractor across Central Texas
Questions
Common questions
What areas do you serve?
Austin and surrounding towns including Round Rock, Cedar Park, Leander, Georgetown, Pflugerville, Hutto, Manor, Buda, Kyle, Bee Cave, Lakeway, West Lake Hills, Dripping Springs.
How do you price a project?
Every job is walked and bid onsite. After the walk we send an itemized fixed bid that lists the scope line by line with one lump-sum total. Because custom homes, remodels, and commercial spaces vary so much, we don't publish price ranges; the bid is built from your site and your scope.
Do you provide itemized proposals?
Yes. Every proposal lists scope line by line with a single lump-sum total, so you can see exactly what is included.
Do you use subcontractors?
Our in-house crews self-perform demolition, framing, drywall, concrete, finish carpentry, and most finishes. Electrical, plumbing, and HVAC are performed by licensed trade partners as Texas requires.
Can you handle permits?
Yes. We prepare and submit permit packages and coordinate inspections with the city or county.