Project · Central Texas
Toll road testing facility gantry erection
Steel erection for a toll road testing facility, where tolling equipment is tested on a closed lane before it goes out on the highway. Our crew stood two lattice towers on their anchor-bolt foundations, flew the overhead truss across the test lane, connected it at both towers, and guyed and plumbed the frame while working at height. The new gantry sits alongside the facility's existing test gantry and equipment building.

Phase 01
Towers set and guyed
Each lattice tower was set on its concrete foundation over the anchor bolts, then held with guy wires while the crew climbed and made the connections at the top.


Phase 02
Overhead truss across the test lane
The truss was flown across the lane and connected at both towers, then the frame was plumbed and squared before the guys came off.


Phase 03
The test facility
The new gantry sits on the same test lane as the facility's existing equipment gantry, barriers, and equipment building.

Questions
Common questions
Do you erect steel gantries and sign structures?
Yes. On this job our crew erected a steel gantry for a toll road testing facility: lattice towers on anchor-bolt foundations and an overhead truss span, guyed and plumbed during erection.
Can you work at height on steel erection?
Yes. Our crew makes connections at the top of towers and along the span, using guy wires to hold the frame safe and plumb until it is fully connected.
How do you price steel erection and civil work?
Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.