Toll road testing facility gantry erection

Steel erection for a toll road testing facility, where tolling equipment is tested on a closed lane before it goes out on the highway. Our crew stood two lattice towers on their anchor-bolt foundations, flew the overhead truss across the test lane, connected it at both towers, and guyed and plumbed the frame while working at height. The new gantry sits alongside the facility's existing test gantry and equipment building.

Toll road testing facility gantry erection, toll road testing facility gantry erection in Central Texas
TypeSteel gantry erection
FacilityToll road testing facility
LocationCentral Texas
ScopeSet towers on anchor-bolt foundations, fly and connect the overhead truss, guy, plumb, and secure
StageComplete

Phase 01

Towers set and guyed

Each lattice tower was set on its concrete foundation over the anchor bolts, then held with guy wires while the crew climbed and made the connections at the top.

Lattice tower guyed in four directions, with crew connecting at the top, toll road testing facility gantry erection in Central Texas
Lattice tower guyed in four directions, with crew connecting at the top
Compact track loader on site beside the guyed tower, toll road testing facility gantry erection in Central Texas
Compact track loader on site beside the guyed tower

Phase 02

Overhead truss across the test lane

The truss was flown across the lane and connected at both towers, then the frame was plumbed and squared before the guys came off.

Truss spanning the test lane between the two towers, toll road testing facility gantry erection in Central Texas
Truss spanning the test lane between the two towers
Gantry standing with temporary guy wires still in place, toll road testing facility gantry erection in Central Texas
Gantry standing with temporary guy wires still in place

Phase 03

The test facility

The new gantry sits on the same test lane as the facility's existing equipment gantry, barriers, and equipment building.

Existing test gantry and equipment building beyond the new tower, toll road testing facility gantry erection in Central Texas
Existing test gantry and equipment building beyond the new tower

Questions

Common questions

Do you erect steel gantries and sign structures?

Yes. On this job our crew erected a steel gantry for a toll road testing facility: lattice towers on anchor-bolt foundations and an overhead truss span, guyed and plumbed during erection.

Can you work at height on steel erection?

Yes. Our crew makes connections at the top of towers and along the span, using guy wires to hold the frame safe and plumb until it is fully connected.

How do you price steel erection and civil work?

Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.