Project · Commercial structural steel, Austin
Commercial rooftop structural steel, starting
A commercial structural steel job getting started in Austin. The main piece is a hot-dip galvanized rooftop equipment platform, about 32 by 36 feet, standing on HSS posts above an existing roof, with W16 girders, W12 beams, bar grating, and a perimeter guardrail. The scope also covers bracing and reinforcement at the existing roof joists, steel supports under the rooftop unit curbs, a new steel frame for an opening cut in a tilt-wall panel, and exterior pipe supports. We built 3D renderings of the install and a detailed shop drawing set for review before anything goes to fabrication. We'll add photos as the steel goes up.

Renderings
3D renderings of the steel install
Before fabrication, we model the new steel in place so everyone can see how it sits on the existing building. New structural steel is shown in dark red and the existing building is see-through. These are conceptual renderings; final dimensions are verified in the field.





Shop drawings
Shop drawings
Our detailed shop drawing set lays out every piece: framing plan, sections, isometrics, piece drawings with running dimensions and copes, connection details, grating and guardrail layout, and the new tilt-wall opening frame. The set goes to the engineer of record and general contractor for review before fabrication. Open full-size sheets: framing plan, sections, isometrics, girder piece drawings, connection details, grating and guardrail, opening frame.







Questions
Common questions
Do you do commercial structural steel?
Yes. On this Austin job we are handling a galvanized rooftop equipment platform, roof framing reinforcement, a tilt-wall opening frame, and pipe supports, from shop drawings through installation.
Do you produce shop drawings for steel?
Yes. We prepare detailed shop drawing sets with framing plans, sections, isometrics, piece drawings, and connection details, and submit them to the engineer of record and general contractor for review before fabrication.
Can you add steel to an existing building?
Yes. This job adds a rooftop platform and new framing to an existing building, with bracing and reinforcement at the existing roof joists. Existing conditions are field verified before fabrication.
How do you price commercial steel work?
Every project is reviewed from the plans and walked onsite, then bid with an itemized fixed bid and one lump-sum total.