Margra Lane emergency access road

A new emergency access road for a multifamily community, running from the apartment property out to Margra Lane in South Austin. We cut the road box, hauled off the spoils, built and compacted the base, paved it in asphalt, and tied it into the existing concrete at both ends, with silt fence and erosion control in place for the whole job. The finished road ends at a swing gate at the property line so it stays closed to everyday traffic and open to emergency vehicles.

Margra Lane emergency access road, emergency access road on Margra Lane in South Austin
TypeEmergency access road for a multifamily property
LocationMargra Lane, South Austin, TX
ScopeExcavation, haul-off, compacted base, asphalt paving, tie-ins to existing concrete, erosion control
CompletedSpring 2026

Phase 01

Excavation

Cutting the road box down to firm subgrade between the new fence line and the neighboring lots, with silt fence up along both sides.

Road box excavated to subgrade, looking toward the apartment property, emergency access road on Margra Lane in South Austin
Road box excavated to subgrade, looking toward the apartment property
Excavated rock and soil staged for haul-off at the property end, emergency access road on Margra Lane in South Austin
Excavated rock and soil staged for haul-off at the property end

Phase 02

Base and compaction

Base material spread, graded, and rolled in lifts to build a firm section that can carry fire trucks.

Rolling the compacted base with a JCB double-drum roller, emergency access road on Margra Lane in South Austin
Rolling the compacted base with a JCB double-drum roller

Phase 03

Asphalt paving and tie-ins

Asphalt placed over the base and tied cleanly into the existing concrete at the street end and the property end.

Fresh asphalt tied into the existing concrete at the street end, emergency access road on Margra Lane in South Austin
Fresh asphalt tied into the existing concrete at the street end
Paved road looking toward the apartments, with the tie-in coned off, emergency access road on Margra Lane in South Austin
Paved road looking toward the apartments, with the tie-in coned off

Phase 04

Finished road

Paved, cleaned up, and gated, with erosion control left in place until the edges establish.

Finished asphalt road behind the emergency access gate and red fire lane curb, emergency access road on Margra Lane in South Austin
Finished asphalt road behind the emergency access gate and red fire lane curb

Questions

Common questions

Do you build emergency access roads for apartment complexes?

Yes. On Margra Lane in South Austin we built a new asphalt emergency access road for a multifamily property, from excavation and base through paving and the gated tie-in.

What goes into an emergency access road?

On this job: excavating the road box to firm subgrade, hauling off the spoils, building and compacting the base, asphalt paving, tie-ins to the existing concrete, and silt fence and erosion control through construction. Final section and width follow the approved civil plans and fire department requirements.

Do you self-perform the site work?

Yes. Our own crews and equipment handle the excavation, base, and compaction, so the road section is built by the same team from start to finish.

How do you price a road or paving job?

We walk the site, review the civil drawings, and send an itemized fixed bid with one lump-sum total.

Request an estimate

Every project starts with an onsite walk.

Tell us what you’re building. We walk the site, then send an itemized fixed bid with one lump-sum total, anywhere in the Austin area. Office hours Monday through Friday, 8am to 5pm.

CallTextEmailEstimate